Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹5.7 L (4.99%)Admitted-Finance | ₹1.2 Cr+₹5.7 L (4.99%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M SAKTHIVEL L1 | P R SELVARAJ L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Renewal of BT road from Kandiyakollai - Pudukudi Road Km 0/0-2/200
Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers | 617.82 | Sqm | - | - |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 594 | Cum | - | - |
| 3.00Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 3.01 | Km 0/0 - 1/0 | 67.5 | Cum | - | - |
| 3.02 | Km 1/0 - 2/0 | 67.5 | Cum | - | - |
| 3.03 | Km 2/0 - 2/200 | 13.5 | Cum | - | - |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 4.01 | Km 0/0 - 1/0 | 5.65 | Cum | - | - |
| 4.02 | Km 1/0 - 2/0 | 6.61 | Cum | - | - |
| 4.03 | Km 2/0 - 2/200 | 3.19 | Cum | - | - |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
20 Nov 2019, 3:00 pmClosed
Project Director
DRDA, Collectorate, Ariyalur
Renewal of BT roads 5 Nos in Package No TN 30-17 in Andimadam Block of Ariyalur District under TNRRIS 2019-20
2019_RDTN_143941_1
A3/4972/2019, Date.31.10.2019
Open Tender
Civil Works - Roads
Works
90 days
DRDA
As per tender document
4 documents required · 4 mandatory
₹0
₹1.2 L
DRDA, Ariyalur
14 Jan 2020
6 Nov 2019
20 Nov 2019
6 Nov 2019
20 Nov 2019
6 Nov 2019
12 Nov 2019
Amount
1.Renewal of BT road from Kandiyakollai - Pudukudi Road Km 0/0-2/200 Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack Coat over BT surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Sign board
Provision for Name board
2.Renewal of BT road from North Pudhukudi road Km 0/0 - 1/400 Picking the existing metalled / BT surface and compacted by power roller etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers.
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack Coat over BT surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Sign board
Provision for Name board
3.Renewal of BT road from Nettalakurichi to Thirukalappur road Km 0/0 to 2/190 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack Coat over BT surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
4.Renewal of BT road from JV Road To Rangiyam Thanjavooransavadi raod KM 0/0-2/850 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack Coat over BT surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
5.Renewal of BT road from Kodukkur to Marungur Road KM 0/0-1/800 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack Coat over BT surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P R SELVARAJ
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_172650.xls
BOQ • 0.31 MB
TechnicalBid17.pdf
Tender Documents • 0.34 MB
PriceBid17.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .