| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹5.2 L (4.17%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.3 Cr+₹5.2 L (4.17%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical CHITAVAR JOGI MEETAI HATHRAS | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
21 Nov 2023, 4:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works Agra
Reconstruction of the bridge (Box Culvert) near Dhamsinga village at km 94.700 of Agra Canal in district Mathura.
2023_UPIDC_856493_3
13/SE/2023-24
Open Tender
Civil Works
Item Rate
180 days
Near Dhamsingha Village
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹2.7 L
23 Dec 2023
11 Nov 2023
21 Nov 2023
11 Nov 2023
21 Nov 2023
11 Nov 2023
Amount
Dismantling of brick work in C.M. i/c disposal of dismantled material within a distance of 60 m. as per direction of Engineer-in-Charge.
Dismantling of RCC work with disposal of refuse within a distance of 60 m. as per direction of Engineer-in-Charge.
Earth work in foundation in wet soil including lift up to 4 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge.
Supplying & Fixing 1200 mm inner dia NP-4 socket hume pipe placing in position i/c all material, Labour, T&P etc. Complete.
Providing & Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete.
Providing & Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete.
Providing & Laying R.C.C.in M-25 with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete.
Providing & Laying C.C. in M-25 with Cement, coarse sand & 20 mm nominal maximum size stone grit including cost of all material, labour and T&P etc. Complete.
Providing & Laying C.C. 1:3:6 Mix with Cement, coarse sand & 20 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete.
Centering and shuttering (steel shuttering) for C.C. work including cost of all labour, material and T&P etc. Complete.
Centering and shuttering (steel shuttering) for R.C.C. work including cost of all labour, material and T&P etc. Complete.
Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete.
Supplying and fixing 75 mm dia P.V.C. pipe for weep holes including cost of all material, labour and T&P etc. complete.
Supplying and laying inverted filter behind weep holes including cost of all material, labour and T&P etc. complete.
S/F 100MM dia pipe for drain spout including cost of all material, labor and T&P etc. required for proper completion of work.
S/F of 25 mm thick joint filler including all labor & T&P etc. rquired for proper completion of work.
Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with pre-moulded joint filler board including cost of all material, labour T&P all lifts and leads etc .compete as per direction of Engineer-in-charge.
Earth work in filling for making Embankment in ordinary soil including 1.50 m lift and total lead of 1.00 Km. by power transport with ramming and dressing the surface to the required level slope as directed by the Engineer-in-Charge & also including all cost of borrowed earth pvt. land, material, labour and T&P etc. Complete.
Providing & Laying Dry brick on edge soiling including all cost of labour, material and T&P etc. complete.
Earth work in removal of diversion in ordinary soil with lift 3.50m lead upto 30 m including excavation , loading, unloading, manual compaction and dressing and all lifts and labour & T&P etc. complete.
Finishing walls with acrylic smooth exterior paint of approved brand and manufacturer and required shade on undecorated wall surface to give even shade over 2.20 lt/10 sqm i/c one coat of primer applied 1.67 lt /10 sqm coat curing and cost of all materials labour ,t&p etc required for proper completion of work for two coat
Surface Dewatering of Water from Main Canal by 5 hp pumps Icluding Hiring Pump, Operator, Pol etc. Complete Arrangement
Supply and laying I shaped precast interlocking tiles of thickness 100 mm (Compressive strength not less than 30 Mpa and wt 4.50 kg) i/c 25 mm thick local sand base levelling and dressing,filling joints with local sand etc. complete of work. (Rubber moulded Grey)
Supplying and Filling empty cement bags with local earth/RBM/Silt, hand sewing with suja & sutli and placing in position within 60M royalty etc. complete as per direction of Engineer incharge.
Supplying and Fixing marble bench mark plate size 150 x 150 x 25 mm with engraved letters including cost of all material, labour and T&P etc. complete.
Supplying and fixing marble name and year plate size 300 x 200 x 25 mm with engraved letters including cost of all material, labour and T&P etc. complete.
Supplying and fixing wheel guard size 150 x 150 x 900 mm with cost of all material, labour and T&P etc. Complete.
Supplying and Fixing of Sign board including cost of all material, labour and T & P etc.
SHIVAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .