Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹32.5 L
Closing Date
9 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE PWSSD FZR
Interception and Diversion of Network MPS STP and FSTP at Arniwala Sheikh Subhan under SBM 2.0
2026_DLG_160380_1
E Tender No 76 (Interception Diversion of Network, MPS, STP and FSTP at Arniwala under SBM 2.0)
Open Tender
Civil Works
Lump-sum
365 days
Ferozepur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹32.5 L
Punjab Water Supply and division ferozpur
16 Mar 2026
16 Feb 2026
10 Mar 2026
16 Feb 2026
9 Mar 2026
16 Feb 2026
20 Feb 2026
Part (i):-Interception and Diversion (I&D) of Network, MPS, STP and FSTP at Arniwala Sheikh Subhan Part (i) Revised DNIT for Providing, laying, Jointing, Cutting & Testing of 800mm, 600 & 400 mm i/d DI K-7 Pipe Sewer, Construction of brick masonry manhole chamber, Construction of MPS Including Pumping Machinery, 400 mm Rising Main complete in all respect and all others works Contingent there to at Arniwala Sheikh Subhan Distt, Fazilka.
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Part (ii):- Survey soil Testing, Design, supply and Construction, Installation, Commissioning of 2.00 MLD Capacity Sewage Treatment Plant cum 6 KLD FSTP at Arniwala Sheikh Subhan Town Distt Fazilka based on Suitable Proven Sustainable Biological technology including other appurtenant works on turnkey basis as per DNIT including Operation and Maintenance for period of 60 Months after stabilization period of 3 Months (Under SBM-2)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.12 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
VOLUME1.pdf
Tender Documents • 19.43 MB
VOLUME2.pdf
Tender Documents • 39.28 MB
VOLUME3.pdf
Tender Documents • 26.65 MB
BOQ.xls
Additional Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .