Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 CrAccepted-AOC | ₹1.7 Cr Quoted ₹1.8 Cr | 1 | Accepted-AOC Work Allotted |
| 2 | 2₹4.2 Cr+₹2.3 Cr (126.4%)Rejected-Finance JIND JIND HARYANA | JIND | HARYANA | 126101 | ₹4.2 Cr+₹2.3 Cr (126.4%) | 2 | Rejected-Finance Rates are on Higher Side |
| 3 | Rejected-Technical KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | - | - | Rejected-Technical Technically Not Qualified |
| 4 | Rejected-Technical 09 PATRAM NAGAR NARWANA 126116 R20 | NARWANA | JIND | HARYANA | 126116 | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
24 Nov 2023, 6:00 pmClosed
OP KARDAM
Municipal Corporation Faridabad
Rejuvenation / Development of Pond Khasra No.27 Village Budena, Faridabad.
2023_HRY_328663_1
20234D326F72 E5FE 40BD A011 42C7D11D6CFA284ULB
Open Tender
Civil Works
Works
365 days
Faridabad (MC)
2 documents required · 2 mandatory
₹5,000
₹3.4 L
Yes
11 Jul 2024
15 Nov 2023
27 Nov 2023
15 Nov 2023
24 Nov 2023
15 Nov 2023
Amount
Provision for alternanthera green/ipomea etc wetland plants
Supply of LED street light fitting 90 Wt. complete in all respect. Make Phillips, Havels, and Surya etc. as per specification annexure- I
Digital time switch (corono) LandT make, conforms to IS/IEC- 60947-4-1 and IEC60947- 4-1. The cost includes installation connection with timer and MNX contactor, energy line and maintaining the system for 2 year sending the operator for resetting with timer if any disturbance or fault replacing if burn due to single facing guarantee complete upto 2 year after installation of energy meter, complete replacement in case of burning accident due to whatever reason.
3 pole power contactor type MNX 110 make LandT Aux. Contacts (2No. = 2 Ne), Cat no. CS94137, AC3 Rating 110 Amp. Conforms to IS/IEC 60947-4-1 and IEC 60947- 4-1. The cost includes installation connection with timer and MNX contactor, energy line and maintaining the system for 2 year sending the operator for resetting the timer if any disturbance or fault replacing if burn due to single facing guarantee complete upto 2 year after installation of energy meter, complete replacement in case of burning accident due to whatever reason.
Provision of 6 KW, three phase energy meter with complete installation, whole work is to be done by contractor himself. Work is considered to be complete after complete installation of energy meter and intelligent smart controller (paid to contractor but as per DHBVNL rate plus INR 1000/ m paid to contractor pursuing and making file charge etc.
Chain link fabric fencing mesh of size 50 x 50 mm, made of G.I. wire of dia. 4mm, PVC coated to outer dia. of 5 mm.
Maintenance for 3 years.
Bidder Name
Amount
The Shri Shri Khatu Cooperative Multi Purpose Society Limited (GSTN-06AAHAT9308G1ZB) BID ID -984722
CHAHAL CONSTRUCITON COMPANY(GSTN-NA)--983860
CHAHAL CONSTRUCITON COMPANY
CHAHAL CONSTRUCITON COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .