Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹37.3 L
Closing Date
31 Jan 2024, 11:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Power Corporation Limited
Sudarshan A B
The major components of the project shall include but not limited to 1. Survey and geological investigation including sub soil exploration. 2.Excavation/Dredging of earthen mound/Island in the D/s of Supa dam. 3.Design and construction of coffered dam/bund.4.Design and construction of RCC cast in situ bored piles. 5. Design and construction of Steel sheet piles.6. Design and construction of RCC retaining wall.7.Design and construction of earthen embankment.8.Design and construction of asphalt roads and RCC Drains.
KPCL/2023-24/DA/WORK_INDENT1070
KPCL/2023-24/DA/WORK_INDENT1070
Open
Dam and Allied works
Two Tender Document System(Two Cover)
KPCL Superintending Engineer CD2 office Bengaluru
3 documents required · 0 mandatory · 3 optional
Intending bidders should have satisfactorily completed (at least 90% of the contract value) as a prime contractor/Joint Venture/Consortium partner and atleast one similar nature work such as Pile foundation of value not be less than Rs.18.66 crores, for State/Central Govt., PSUs/Corporate or any other reputed institution in the last five financial years (2018-2019, 2019-2020, 2020-2021, 2021-2022, 2022-2023). The intending bidder should submit work completion certificate issued by the officer not less than the rank of Executive Engineer/competent authority. Further, the Value of the Completed Works shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-2024.
Intending bidder(s) should have achieved minimum annual financial turnover of Rs.37.31 crore, at least in two financial years in past five completed financial years (2018-2019, 2019-2020, 2020-2021, 2021-2022, 2022-2023) (in all classes of civil engineering construction works only). As a proof of annual turnover certified copies of the income tax returns, audited balance sheet (head wise) and profit and loss account certified by the chartered accountant is to be submitted. Further, the Financial Turnover of the Previous Years shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-2024.
A copy of the Joint-Venture Agreement (JVA) entered into by the partners shall be submitted
Bidder shall upload the income tax pan copy
Bidder shall upload the GST Registration certificate
Bidder shall upload the Independent PF code registration certificate
Bidder shall upload declaration 1 as per Bid Document Page Number 210 & 211.
Intending bidder(s) should have executed in any one year, the minimum quantities of work as per clause 1 (iv) of minimum qualifying requirements in bid document enclosed
Bidder shall upload Equipment/Machinery requirement as per clause 1 (v) of minimum qualifying requirement in the bid document enclosed.
₹7,500
₹37.3 L
2 Jan 2024
2 Jan 2024
2 Feb 2024
16 Jan 2024
19 Jan 2024
Design and Construction of Anchored RCC retaining wall resting on RCC piles at downstream of Supa dam, Ganeshgudi on EPC Turnkey Basis
Design and Construction of Anchored RCC retaining wall resting on RCC piles at downstream of Supa dam, Ganeshgudi on EPC Turnkey Basis
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SUPA BID Document-01.01.2024.pdf
Tender Document • 1.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .