Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
9 Jul 2026, 3:00 pm
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
N-SG-36-2026-27-COP-16
N-SG-36-2026-27-COP-16
Open
12 Months
Adilabad, Telangana
₹0
₹2.9 L
16 Jun 2026
16 Jun 2026
25 Jun 2026
Supply of modular terminal block (WAGO or similar) as per RDSO specification RDSO/SPN/189/2004 Ver. 3.0 or latest consisting the following parts: a) 2 conductor disconnect 05 terminal block - 6 numbers. b) End / intermediate plate suitable for 2 conductor disconnect terminal -1 number c) Screw less end stop similar to WAGO Model No. 249-117 -2 numbers Insulated jumper WAGO Model 280-402 - 5 numbers e) Din Rail - 0.1 metre per set (in length of 1 metre for every ten set). Inspection by RDSO.
Supply of GKP type Location Boxes, Full size as per drg. No. S&T/MFT/T.2378. Inspection by RITES. Above/
A2-Supply Portion (Non-SOR Items) 533052.00 Below/P
Supply of managed Optical Media Converter Complied RDSO spec. SPN/TC/103/2013 rev. 0 consisting of minimum four user ports 10/100 Mbps (2.1.3.2) without. POE: two SFP slots for 01 networking : Two electrical Ethernet ports for networking : dual power supply support AC 230 VAC / DC - 48 VDC from single socket : Two numbers EOLS1312 - 10-D 1000 base -LX 10 Unit to work in daisy chain or ring topology : Make / Model : Teamlink 2100 - Team Engg./ Team Link or similar. Inspection by Consignee.
Supply of 4 corescreen cable make suraabhi/Jhonson or similar. Inspection by CONSIGNEE. Above/
Supply and Laying of G.I Pipes with medium and threaded collar and coupler, quality to specification IS.1239 (part-I) 1990 and galvanised to specification IS.4736-1986. G.I Pipes of 100 mm diameter. Inspection by RITES.
Location box foundation and erection: Excavation of pit, casting concrete foundation and erection of apparatus case Full size as per SCR Drg. No. 5781 and fixing of 1 No. of 'E' type lock 08 for the front door, latching arrangement for backdoor, fixing of Hylam sheet (Hylam sheet supply is covered elsewhere and Wooden Reapers also can be used in place of Hylam sheet for which supply and fixing covered elsewhere) and painting the apparatus case inside and outside with one coat of red oxide, two coats of aluminium paints outside and white paint inside including painting of termination, equipment and number particular on location box (foundation bolts and nuts, 'E' type lock, cement, river sand, stone jelly of size 20/20mm, paints, varnish, fixing bolts and nuts and all other miscellaneous material required for the work shall be supplied by the contractor).
Fabrication, s u p p l y a n d erection o f conventional E a r t h to Signalling/Telecom equipments -Excavation of earth and providing earth pipe of size 50mm dia. 3.5mm thick 2.0 m. long G.I. pipe of heavy quality with masonry tub constructed around at earth locations as specified by site 09 Engineer. Alternate layers of 30kgs-charcoal and 30kgs-common salt to be filled in the pit while closing. The pipe perforation etc., to be carried out as per drawing No. SK 10/10. The earth pipe to be connected to the function with cable as supplied by Railways. The reading should be painted on the masonry tub. The masonry tub of 300 mm x 300 mm x 300mm (along with Kundi) should be covered with cement slab.
Breaking o f metal/ t a r roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the road shall be concreted to match with the old surface. Per
Cable termination including fixing terminals, fuses, LDs, Meggering of cables and recording the readings.
Earthing and soldering of cable armour. Numbers=per cable.
Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the Railway representative at site. The work includes, ensuring the safety of the 14 signalling system, releasing the cable coils to give access for shifting/turning the location boxes. Necessary masonry work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site. If the existing earth connections to the location boxes are disturbed, the earth wires shall be properly reconnected. [All materials required for the work shall be supplied by the Contractor]. Shifting of apparatus case (Full)
Supply and Installation of OFC joint enclosure and splicing of Optic fibre cable (24 fibres) and testing as per technical specification N o . G R OJC-2/02 Sept 2003. Supply of Splice 15 Enclosure (24 fibre) shall be of TVS make Part No.1500-L18X-XX or similar as per Board specification of TEC. and as per RDSO/SPN/TC/68/2014 Revision 1.0 amd 1 or latest . All materials including Fusion splicing machine used for fibre splicing and, OTDR for testing and other testing materials if any shall be arranged by the contractor. Inspection by CONSIGNEE.
Blowing of armoured optic fibre cable (OFC Cable supplied by Railways) into the duct supplied vide other NS item of supply portion by using blowing machine and associated works. 10% 16 of OFC length to be blown extra on both ends of Duct i.e. total 20% of Duct length. Before blowing the duct integrity shall be tested. If any defect is found during duct integrity test, the entire length of HDPE duct from one chamber to another chamber is to be replaced by the contractor at his own cost. Payment will be made as per the length of Duct from which OFC is Blown.
Releasing of existing apparatus cases (Full/ Half/ Quarter size) without damage after releasing the shelf planks, Terminal blocks, Fuse Blocks, Terminal Boards, Relays of all types EKTs, 19 Secondary Cells, power equipments, 'E' type locks, etc., and breaking the concrete foundation. After releasing, the resultant pits are to be closed and consolidated by ramming and levelling. The released materials shall be accounted and stacked at a place as instructed by Railway representative at site. Above/
B2-Labour Portion (Non-SOR Items) 72510.00 Below/P
Laying of various telecom / data/ powerc ables through PVC pipe, PVC casing as per site requirement. The work to be carried outas per instructions of site supervisors and guidelines in Chapter-IV of the Tender Document. Inspection by consignee.
Fixing of Reflex Horn speaker with 4 mm thickness flat angles to the post/COP available on the platform with suitable coupling arrangements and necessary fixtures as per site requirement
Item Breakup - B1-Labour Portion (SOR Items)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Drawings.pdf
ATTACHMENT
2026_06_16_Tender_Document_COP_Extension_9_Stations.pdf Tender Document
ATTACHMENT
2026_06_16_Tender_Document_COP_Extension_9_Stations.pdf
ATTACHMENT
Download all tender documents and submit your bid