Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.9 LAdmitted-Finance NA | L1 | Admitted-Finance | ||
| 2 | L2₹27.9 L+₹1,116.16 (0.04%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹27.9 L+₹1,116.16 (0.04%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹27.9 L
EMD Value
₹2.8 L
Closing Date
11 May 2026, 12:00 pmClosed
EO, NPP BILARI (MORADABAD)
NAGAR PALIKA PARISHAD BILARI, DISTRICT MORADABAD
WARD NO- 11 ME EIDGAAH ROAD PAR EINT CHINAAI NALA NIRMAN KARYE. (ODF SE HONE WALE OVER FLOW KE NISTARAN HETU)
2026_DOLBU_1140348_7
41/N.P.P.B./2026-27 Dated 17-04-2026
Open Tender
Civil Works
Percentage
90 days
BILARI (MORADABAD)
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,304
EXECUTIVE OFFICER, NPP BILARI
₹2.8 L
26 May 2026
22 Apr 2026
12 May 2026
22 Apr 2026
11 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 2.1.1 All kinds of soil. DSR 2023 Item No-2.1.1 (Rate=129.85*0.749=97.26/Cum) | 1 | CUM | - | - |
| 2 | Providing & Laying P.C.C. 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources.DRS Item no -(4.1.10) Rate(6518.60*0.749=4882.43/Cum) | - | Cu-m | - | - |
| 3 | Renforcement cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources.DSR Item No -5.1.2 (Rate=9045.75*0.749=6775.25/Cum) | - | Cu-m | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(Thermo-Mechanically Treated bars of grade Fe-500D or more) .DSR Item No-5.22.6 (Rate=107.10*0.749) | - | Kg | - | - |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth: Cement mortar 1:4 (1 cement : 4 coarse sand) DSR ITEM No-6.1.1 (Rate =7370.65*0.749=5520.62/cum) | 0.6 | Cu-m | - | - |
| 6 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) DSR code No-13.4.1 (Rate=357.35*0.749=267.66/Sqm) | - | Sq-m | - | - |
| 7 | 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived fromnatural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR Code 2023 - 4.1.3 (Rate - 7878.50x0.749 = 5901 /cu-m | - | Cu-m | - | - |
| 8 | Supply & Fixing inaguration stone/ information board in piar of brick work complete in all respect. | - | Job | - | - |
| 9 | Add GST 18% | - | Percent | - | - |
| 10 | Adjustment for Say | - | Percent | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_2129627.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .