Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Fee/PreQual/Technical/Finance | -19.00% | ₹17.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.1 L+₹2.0 L (11.5%)Admitted-Fee/PreQual/Technical/Finance | -9.66% | ₹19.1 L+₹2.0 L (11.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.3 L+₹2.1 L (12.3%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹19.3 L+₹2.1 L (12.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.8 L+₹2.7 L (15.6%)Admitted-Fee/PreQual/Technical/Finance | -6.40% | ₹19.8 L+₹2.7 L (15.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.1 L
EMD Value
₹42,300
Closing Date
20 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Reconstruction of Three Grave Yards and earth filling and repairing wall at Dar Mohalla Buchpora
2026_HAUDD_318044_25
SHORT Term NOTICE INVITING ETENDER No. 22 of 2026-2027 Dated 27.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
Dar Mohalla Buchpora
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹801
FA/CAO AC NO 0216010200000007
₹42,300
24 Aug 2026
28 Jul 2026
21 Aug 2026
28 Jul 2026
20 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance, cutting of small plants, grass, herbs, shrubs and removal of mulba etc and stacking of same | 30 | No. | 553 | ₹16,590 |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 4,089.21 | Sqm | 24.12 | ₹98,631.75 |
| - | Supplying, Stacking, Laying and Spreading of good earth in layers free from all foreign material consolidating each deposited layer by ramming and watering with all carriages and from source to site including royalty (Earth Measured in stacks will be reduced by 20/% for payment). | 1,993.76 | Cum | 850 | ₹16,94,696 |
| - | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 515.45 | Sqm | 283.8 | ₹1,46,284.71 |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: two or more coats on steel work | 1,180.29 | Sqm | 131.85 | ₹1,55,621.24 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 2.5 | Cum | 350 | ₹875 |
| - | Carriage of material by mechanical Transport.
Sand | 6.75 | Cum | 409.94 | ₹2,767.1 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1047322.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .