| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAdmitted-Finance | ₹11.0 L | L1 | Admitted-Finance |
| 2 | L2₹12.1 LAdmitted-Finance | ₹12.1 L | L2 | Admitted-Finance |
| 3 | L3₹13.2 LAdmitted-Finance | ₹13.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AL FALAH ELECTRICAL WORKS L1 | SOLARCITY ELECTRICALS AND SUPPLIERS L3 | M/s ABUTURAAB ELECTRICAL ENGINEERING L2 |
|---|---|---|---|---|---|---|
| 1.00Part-I - Shifting of electrical utilities for upgradation of alternate Sunnar Khul Bund road as Motorable road falling under the jurisdiction of ESD Watalkadal, ED 3rd | ||||||
| 1.01 | Supply, Installation, testing and commissioning of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14 mm diameter, provided at height of 300mm above the planting depth which should be 1.5 mtr (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 3 | No. | 16,800 ₹50,400 | 15,700 ₹47,100 | 23,000 ₹69,000 |
| 1.02 | Supply, laying, installation, testing and commissioning of 100 mm² ACSR | 315 | Mtr | 125 ₹39,375 | 120 ₹37,800 | 100 ₹31,500 |
| 1.03 | Supply, installation, testing and commissioning of 11KV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 12 | No. | 250 ₹3,000 | 450 ₹5,400 | 200 ₹2,400 |
| 1.04 | Supply, installation, testing and commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 9 | No. | 200 ₹1,800 | 845 ₹7,605 | 80 ₹720 |
| 1.05 | Supply, fabrication & installation of GI V/X Channel/Angle/Flat of sizes including Back clamps/Collars | 315 | kg | 120 ₹37,800 | 165 ₹51,975 | 50 ₹15,750 |
| 1.06 | Supply and fixing of GI Wire 6 SWG & 8 SWG | 20 | kg | 110 ₹2,200 | 50 ₹1,000 | 100 ₹2,000 |
| 1.07 | Supply and fixing of Galvanized Nuts and Bolts full thread of sizes as per IS | 6 | Kg | 120 ₹720 | 160 ₹960 | 110 ₹660 |
| 1.08 | Providing and laying of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm | 6 | No. | 600 ₹3,600 | 3,000 ₹18,000 | 620 ₹3,720 |
| 1.09 | Supply and fixing of Danger Plate With Clamps as per Standards wih writing in English & Urdu. | 6 | no. | 100 ₹600 | 250 ₹1,500 | 100 ₹600 |
Updated dates
Tender Value
₹14.5 L
EMD Value
₹29,060
Closing Date
29 Jan 2026, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Office of Executive Engineer, ED-3rd Srinagar
Shifting of electrical utilities for upgradation of alternate Sunnar Khul Bund road as Motorable road behind Super Specialty hospital, Shereen Bagh Srinagar(Turnkey Basis).
2025_PDD_299450_1
ED-III /31 of 2025-26, Dated- 30-12-2025
Open Tender
Electrical Works
15 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specification, Drawings
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED-3rd Srinagar
₹29,060
5 Feb 2026
30 Dec 2025
30 Jan 2026
30 Dec 2025
29 Jan 2026
1 Jan 2026
1 Jan 2026 - 29 Jan 2026
Shifting of electrical utilities for upgradation of alternate Sunnar Khul Bund road as Motorable road falling under the jurisdiction of ESD Watalkadal, ED 3rd
Supply, Installation, testing and commissioning of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14 mm diameter, provided at height of 300mm above the planting depth which should be 1.5 mtr (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, laying, installation, testing and commissioning of 100 mm² ACSR
Supply, installation, testing and commissioning of 11KV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, installation, testing and commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, fabrication & installation of GI V/X Channel/Angle/Flat of sizes including Back clamps/Collars
Supply and fixing of GI Wire 6 SWG & 8 SWG
Supply and fixing of Galvanized Nuts and Bolts full thread of sizes as per IS
Providing and laying of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm
Supply and fixing of Danger Plate With Clamps as per Standards wih writing in English & Urdu.
Supply and fixing of Anti Climbing devices (GI Barbed Wire (12 SWG)
Providing and painting of poles with single coat of red oxide an two coats of Aluminum Paint
Supply and installation of Guard netting
Supply, Installation, testing and commissioning of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14 mm diameter, provided at height of 300mm above the planting depth which should be 1.5 m (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, laying, installation, testing and commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al)
Supply and Fixing of Suspension/Tension Clamp with eye hook along with Pole Collar/Back Clamps
Dismantling of old ST Poles and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Dismantling of Existing Gantry Structure and Shifting of same to the Divisional Store including carriage, transportation, loading, unloading.
Dismantling of old ACSR (100 mm2 of different sizes and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Dismantling of existing LT AB Cable along with allied material and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.40 M3 per Pole)
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.48 M3 per Pole)
Shifting of utilities i.e., 630 kVA Sub-Station along with HT Line of feeder no. 3 emanating from Receiving Station Shereen Bagh near sunner kull bund for proposed road widening/development falling under the jurisdiction of ESD Pather Masjid ED 3rd
Supply, Installation, testing and commissioning of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14 mm diameter, provided at height of 300mm above the planting depth which should be 1.5 mtr (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Installation, testing and commissioning of 11 KV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)
Supply, Installation, testing and commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200A as per Relevant IS.
Supply, Installation, testing and commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V)
Supply, Laying, Installation, testing and commissioning of 630 mm² Single Core Cable,1.1kV Grade, Un-armoured, XLPE Insulated Stranded Conductor FRLS type including providing of lugs/thimbles/clamps.
Supply, installation, testing and commissioning of G.I Pipe of 150 mm dia 3 mtr long for Pole Butts (6")
Supply, installation, testing and commissioning of GI Channel/Angle/Flat of sizes including clamps for 1. L.A Set/G.O Set/Horn Gap - 150 kg 2. Transformer Pad/G.I Channel Bedding - 450 kg 3. HT Network - 322 kg
Supply, installation, testing and commissioning of 11KV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, installation, testing and commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing and laying of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm
Supply, installation, testing & Commissioning of LT Fuse Set for Distribution Transformers (Customised) as per KPDCL Drawing no. CE/P&P/DRG/2023/LTFS/001
Providing & Laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply and fixing of Danger Plate With Clamps as per Standards wih writing in English & Urdu.
Supply & Fixing of PG Clamps/ Wedge connectors
Supply and fixing of Anti Climbing devices
Supply and fixing of Galvanized Nuts and Bolts full thread of sizes as per IS
Providing and painting of poles with single coat of red oxide an two coats of Aluminum Paint
Supply, laying, installation, testing and commissioning of 100 mm² ACSR
Supply and fixing of GI Wire 6 SWG & 8 SWG
Supply, Installation, testing and commissioning of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14 mm diameter, provided at height of 300mm above the planting depth which should be 1.5 m (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply and fixing of 16 kN Polymer Shackle Insulators along with GI U-Clamps for Shackle Insulators
Shifting (Dismantling & re-erection, Testing and Commissioning-Integration with system) of 630 KVA Distribution Transformer from current site to Proposed Site including carriage, transportation, loading, unloading.
Dismantling of old substation alongwith allied material and shifting of same to divisional store including transportation, carriage, loading/unloading from site to divisional store. details: 1. Old Substation Poles with allied Material 2. Old Cable
Dismantling of old PCC Poles - 02 no.
Dismantling of old ST Poles and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Dismantling of old ACSR (100 mm2 of different sizes and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.40 M3 per Pole)
Providing of material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.48 M3 per Pole)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_971441.xls
BOQ • 0.31 MB
SBD31.pdf
Tender Documents • 0.87 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
Download all tender documents and submit your bid