Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹67,800
Closing Date
26 Feb 2026, 2:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
OT 230 Air Conditioning and Ventilation System 365 days
2026_EB_661566_1
OT 230 Air Conditioning and Ventilation System 365 days
Open Tender
Maintenance Works
Works
365 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹67,800
Yes
19 May 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Charges for inspection & attending routine maintenance / General cleaning / minor breakdown works in Chiller unit / AHU / AWU (Unitary & Masionary Air washer unit) / Split Unit / Package Unit / and its connected equipments at all locations, and the cost of consumables & Personal protective equipments such as cotton waste,hand gloves, face mask, ear plug, T&P, lead, lift etc.,
Charges for changing the 1.5TR / 2.0 TR compressor of the split unit Dismantling, fixing and commissioning & the cost of consumables like N2 gas, cutting gas, brazing rod,T&P, lead, lift etc., (R22 Gas, Compressor will be supplied by TNPGCL)
Charges for Refilling the R22 refrigerant for 1.5 TR/2 TR Split units including the cost of transporting, refilling, testing, commissioning & cost of consumables like N2 gas, cutting gas, brazing rod, cotton waste, hand gloves, T&P, lead and lift etc.,(R22 Gas will be supplied by TNPGCL)
Charges for Refilling the R22 refrigerant for Package units / R407C refrigerant for Chiller units including the cost of transporting, refilling, testing, commissioning & cost of consumables like N2 gas, cutting gas, brazing rod, cotton waste, hand gloves, T&P,lead and lift etc.,( R22 / R407C gas will be supplied by THPGCL)
Charges for Dismantling the erected 1.5 TR / 2 TR Split unit and to refix the same in required area at MTPS II site and the cost of consumables, such as cotton waste, hand gloves, T&P,lead,lift etc.,
Charges for Renewal of damaged duct sheet of different sizes including the cost of sheets, transporting, Dismantling, Refixing, fixing and removing of scaffolding arrangements (Scaffolding Materials are under contractor scope) & the cost of consumables, such as cotton waste, hand gloves, T&P,lead, lift etc.
Charges for changing the 11TR compressor of the Package unit Dismantling, fixing and commissioning & the cost of consumables like N2 gas,cutting gas, brazing rod,T&P, lead, lift etc., (Compressor and R22 Gas will be supplied by TNPGCL)
Labour charges for cutting and removing the eroded /punctured portion of the plates and fixing new plates & welding in Air Washer Units, Air handling units, cooling towers and its connected pipe lines etc.,
Charges for cleaning, painting of EPOXY zinc chromate primer one coat and EPOXY smoke gray paint two coats in the patch weld portion of the plates and pipe lines in Air Washer units, Air handling units, cooling towers and its connected pipe lines etc.,
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_794076.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .