| 1 | L1₹18.8 LAccepted-Finance | ₹18.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹18.8 LRejected-Finance | ₹18.8 L | L2 | Rejected-Finance L2 |
Updated dates
Tender Value
₹19.6 L
EMD Value
₹2.0 L
Closing Date
21 Jan 2026, 12:00 pmClosed
EE CD1 PWD ORAI
EE CD1 PWD ORAI
In 2025-26 Construction work of an exit gate in the name of freedom fighter Swami Brahmanand Ji Maharaj at km 398 of Orai Muhana Road in Jalaun district.
2025_CEJNS_1101522_2
3042/10A dated 24.10.2025
Open Tender
Civil Works - Roads
90 days
ORAI
In 2025-26 Construction work of an exit gate in the name of freedom fighter Swami Brahmanand Ji Maharaj at km 398 of Orai Muhana Road in Jalaun district.
3 documents required · 3 mandatory
₹1,200
₹2.0 L
Yes
EE CD1 PWD ORAI
25 Apr 2026
29 Dec 2025
21 Jan 2026
29 Dec 2025
21 Jan 2026
29 Dec 2025
30 Dec 2025
Excavation in foundations in ordinary soil (loam day or sand) including lift upto 1.5 m (5 fts.) & including filling. Watering and ramming of excavated earth into the trenches or into the space between or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt (100 fts) form the foundation trenches.
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km , from the site of work and including watering , dressing etc. Rate to include cost of all materials, labour and T&P etc. Chapter 4 SI No 255
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete wrok, using coarse aggregate and fine aggregate derived from natural sources, Portland pwzzolana/Ordinary portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, to improve durability and workability without impairing strength, including pumping of concrete to site of laying curing carriage for all leads, but excluding the cost of centering shuttering and finishing as per dirction of the engineer-in-charge for the following grades of concrete, concrete of M15 grade with minimum cement content of 220 kg/cum
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level 1:1.5:3 (1Cement : 1.5 Coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 30 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work Above plinth level 1:1.5:3 (1Cement : 1.5 Coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 30 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work Above plinth level 1:1.5:3 (1Cement : 1.5 Coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates) wrought to required shape as necessary including behding for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level.
Brick work bricks of class 150in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 Cement : 4 Coarse sand)
20 mm Cement plaster of mix 1:4 (1 Cement 4 Coarse sand) : Fair Side
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/subway and bridge deck etc. prepared by mixing in the ratio of 5 :2 (5 parts integral crystalline slurry :2 parts water) for vertical surfaces and 3 :1(3Parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the reqrirements as specified in ACI-212-3R-2010i.e by reducing permeability of concrete by more than 90 % Compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalling slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The worl shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Finishing walls with Premium Acrylic Smooth exterior paint with Sillicone additives of reqrired shade. New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.2 kg/10 sqm).
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Centering and shutting including strutting propping etc. and removal of form for all heights :Foundatins, footings, bases of columns etc for mass concrete.
Suspended floors, roofs, landings, balconices and access platform
Columns, Pillars, Piers, Abutments, Posts and Struts.
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Edges of slabs and breaks in floors and walls
For 8.0 mt height (8.0-3.5)*384.3
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever reqrired for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge The elevtional area of the scaffoding shall be measured for payment purpose The payment will be made once irrespective of duration of scaffolding. This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
T1.pdf
Tender Documents • 1.01 MB
BOQ_2030322.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid