Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.3 L+₹35,479.31 (18.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹35,820.46 (18.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.3 L+₹37,014.48 (18.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.5 L+₹51,172.09 (25.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹6,820
Closing Date
16 Apr 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEN REW UDHAMPUR
as per nit
2026_RDPR_307400_9
e-NIT No. 01 REW UDHAMPUR of 2026-27 Dated 04-04-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹6,820
22 Apr 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Bulk excavation by hydraulic means in trenches ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : 2 | - | cum | 187 | - |
| 2 | Earth work in Bulk excavation by hydraulic means in trenches ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : 2 | - | cum | 479.3 | - |
| 3 | P/Laying c.stone conc 1:5:10mix using 40 mm n/s agg and curing complete | - | cum | 4,826.5 | - |
| 4 | P/Laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 30%boulders: 70% Qty. in Conc. | - | cum | 5,733.6 | - |
| 5 | P/Laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 30%boulders: 30 % Qty. In Boulders | - | cum | 937.9 | - |
| 6 | Centring and shuttering including strutting propping etc and removal of form work | - | sqm | 286.35 | - |
| 7 | Back filling behind R/Wall in trenches. | - | sqm | 218 | - |
| 8 | P/L 50 mm thick flooring in 1:2:4 mix using 20 mm n/s agg and c.complete. | - | sqm | 571 | - |
| 9 | P/L NP-3 class (Heavy duty) R.C.C PIPES(1.0 M)Dia. | - | Rmt | 3,591.7 | - |
| 10 | Add provision for Sign Board (to be paid as per actual) | - | No. | 3,000 | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_997300.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .