Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
12 Oct 2026, 2:00 pm
CE/NCTPS-II
Office of CE/NCTPS-II Chennai-120
NCTPS II Civil Maintenance circle Civil Maintenance Division Repair and maintenance work to the western side compound wall by closing the holes using RR masonry Providing security fencing over the compound wall etc complete in NCTPS II
2026_EB_708219_1
CE/NCTPS-II/SE/CM/11/2026-27
Open Tender
Civil Works
Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,900
Yes
25 Sept 2026
25 Sept 2026
13 Oct 2026
25 Sept 2026
12 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing RR Masonry in CM 1:5 including cost of all materials, T&P, lead, lift etc., complete and as directed by Engineer in charge at site | 7.15 | m3 | - | - |
| 2 | Providing two legged scaffolding for Brick work, plastering and pointing using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails. | 308 | m2 | - | - |
| 3 | Brickwork in CM 1:5 using Fly ash bricks including cost of all materials, labour charges, lead, lift etc., complete. | 3 | m3 | - | - |
| 4 | Providing P.C.C 1:1.5:3 using 6 to 10mm HBG metal for RR Masonary packing including cost of all materials, lead, lift, curing etc., complete | 2.9 | m3 | - | - |
| 5 | Fabrication and fixing of MS Angles for fencing at top of the compound wall., including cost of cutting, welding and fixing in position, materials, labour charges, all leads, lifts etc. complete. | 113.7 | Kg | - | - |
| 6 | Painting two coats of synthetic enamel paint for iron works after thorough scrapping of rest including cost of all materials, Labour, lead, lift, T&P etc. complete and as directed by the engineer at site. | 17.1 | m2 | - | - |
| 7 | Providing P.C.C 1:2:4 using 20mm HBG metal for "Y" post support including cost of all materials, lead, lift, curing etc., complete | 0.3 | m3 | - | - |
| 8 | Providing and fixing Barbed wire of approved quality to stiffen the "Y" post in compound wall by running it through, including the cost of all materials, lead, lift, labour charges etc. complete. | 216 | Rm | - | - |
| 9 | Providing and fixing GI PVC insulated binding wire and Barbed wire for Spiral of approved quality to stiffen the fencing, including the cost of all materials, lead, lift, labour charges etc. complete. | 144 | Rm | - | - |
| 10 | Flush Pointing with Cement mortar 1:3, in RR Masonary compound wall including cost of all materials, lead, lift, labour charges, etc., complete. | 627 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Spec11.pdf
Tender Documents • 0.77 MB
BOQ_851100.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .