Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 CrAdmitted-Finance 236 174 4 PRATHAM TAL TRIVENI GAS GODOWN ROAD NEW MEHNDORI TELIYARGANJ PRAYAGRAJ 211004 | PRAYAGRAJ | UTTAR PRADESH | 211001 | -1.30% | ₹6.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹7.4 L (1.06%)Admitted-Finance 9 2 136 CHOWK MAHAJANI TOLA RIKABGANJ FAIZABAD AYODHYA U P | FAIZABAD | AYODHYA | UTTAR PRADESH | -0.25% | ₹7.0 Cr+₹7.4 L (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 Cr+₹8.8 L (1.27%)Admitted-Finance | -0.05% | ₹7.0 Cr+₹8.8 L (1.27%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹37.1 L
Closing Date
24 Jul 2025, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Ayodhya Dham Ke 15 Wardo me 70 Naveen Aaganbadi Kendro Ka Nirman Karya
2025_DOLBU_1054101_1
346/NNA/2025
Open Tender
Civil Works
Percentage
180 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹97,850
MC
₹37.1 L
30 Jul 2025
3 Jul 2025
24 Jul 2025
3 Jul 2025
24 Jul 2025
3 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including opreeting of wank vegetation,grass, brush wood,trees and sapling of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 5 m outside the periphery of the area cleared as per SOR 2.31 | 15,750 | Sqm | 6 | ₹94,500 |
| 2 | Earthwork in excavation for structure as per drawing and technical specification clause 305.1including setting out construction of shoring and bracing ,removal of stumps and other deetrious materials and disposal upto a lead 50m dressing of bottom and back trenches with essuitable meinra SOR 2020 2.8 | 273 | Cum | 197 | ₹53,781 |
| 3 | Filling avalible earth excluding trenches,plinth,foundations etc, not exceeding 20 depth, consolida deposited layer and water to as per SOR 2.25 | 2,087.4 | cum | 110 | ₹2,29,614 |
| 4 | Provinding and laying position cement 6:12 1 cement 40 mm nominal mortor brick SOR 273 | 483 | cum | 4,553 | ₹21,99,099 |
| 5 | Brick work with burnt clay non bricks of class loundation and mortor brick SOR 6.1.2 | 253.4 | cum | 6,519 | ₹16,51,914.6 |
| 6 | Brick work with burnt clay F.P.S modular bricks 150 in and mortor brick SOR 1:6 as per | 1,120 | cum | 6,750 | ₹75,60,000 |
| 7 | Providing and position specifict reiniorced cement as per SOR 1.2 | 462.7 | cum | 7,482 | ₹34,61,921.4 |
| 8 | Centering and including removal of for griders complete item as per SOR | 1,358 | Sqm | 301 | ₹4,08,758 |
| 9 | Reinforced cement work in up to 150 baiconies sillis as staircascs and spiral stair cases up to floor five level excluding the cost as per SOR | 952.7 | Sqm | 8,623 | ₹82,15,132.1 |
| 10 | Centering and shuttering including strutting etc, and removal of form for lintels, beams, plinth beams, all vomplete item 5.9.5 PWD SOR | 6,624.8 | Sqm | 301 | ₹19,94,064.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .