Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.1 LAccepted-AOC | L-1 | Accepted-AOC As per NIT/TC | |
| 2 | Rejected-Technical | - | Rejected-Technical Not, evaluated as not L-1 | |
| 3 | Rejected-Technical WARD NO 03 MAIN ROAD DISTT SINGRAULI MP PIN 486889 | SINGRAULI | SINGRAULI | MP | 486889 | - | Rejected-Technical Not evaluated as not L-1 |
Tender Value
₹21.0 L
EMD Value
₹26,300
Closing Date
1 Mar 2024, 10:00 amClosed
Staff Officer (EM)
GM Office Khadia Area,Shaktinagar, Northern Coalfields Limited, Ministry of Coal, PIN 231222
Day to day running maintenance of pump sets and other miscellaneous work associated with pumps in mines and workshop during monsoon 2024 and non monsoon 2024-25 for a period of one year
2024_NCL_301495_1
KHD/EM/E-Tender/23-24/525 DT 14.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Khadia Project
Please refer NIT
2 documents required · 2 mandatory
₹26,300
19 Apr 2024
15 Feb 2024
2 Mar 2024
15 Feb 2024
1 Mar 2024
16 Feb 2024
15 Feb 2024 - 22 Feb 2024
Amount
During Monsoon period: Day to day Running maintenance of pumps, motors,suction ,delivery,pontoon,walkway,tin shed & other accessories installed in mines and at workshop and as per instruction of EIC. i) Location at Turra West,Turra East,and purewa bottom,Chilkatand pump house, ETP , Dozer Section etc,workshop of E&M coal section) ii) Tools & Tackels Supply by Contractor ( Chain pulley Block suitable to jobs , 2 no. Cutting set ,2 no. Welding set , 2 no. welding Machine etc. should be made avilable throughout the contract period)
During Non -monsoon period: Day to day Running maintenance of pumps, motors,suction ,delivery,pontoon,walkway,tin shed & other accessories installed in mines and at workshop and as per instruction of EIC. i) Location at Turra West,Turra East,and purewa bottom,Chilkatand pump house ,ETP , Dozer Section etc,workshop of E&M coal section) ii) Tools & Tackels Supply by Contractor ( Chain pulley Block suitabal to jobs , 1 no. Cutting set ,1 no. Welding set , 1 no. welding Machine etc. should be made avilable through out the contract period)
Total impact of GST for the purpose of CTC
M/s. Bull Mechanical Works
LION INDIA CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .