Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 LAccepted-AOC 76 NEAR NSCB COLLAGE PATAKEDA SARNI DISTT BETUL M P | L-1 | Accepted-AOC L-1 for item no. 1 | |
| 2 | L-1₹1.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 for item no. 2 | |
| 3 | L-2₹2.9 LRejected-AOC 37 LIG OPPOSITE STADIUM GANDHI NAGAR KHARGONE | L-2 | Rejected-AOC L-2 | |
| 4 | L-3₹3.0 LRejected-Finance MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | R.K.CONSTRUCTION L1 | CAREWELL CONSTRUCTION L4 | SAI CONSTRUCTION L2 | M/S NIGAM CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.10 | Laying, Extension & Diversion of MS ERW pipe of size 300 NB at bottom ash discharge end at ASH BUND. | 600 | Mtrs | 66,000 ₹77,880 Lowest | 90,000 ₹1,06,200 | 75,600 ₹89,208 | 73,200 ₹86,376 |
| 1.20 | Fabrication of 45/70/90 degree bend as per site requirement from 300 NB MS ERW pipe | 5 | Nos | 7,400 ₹8,732 | 5,000 ₹5,900 Lowest | 7,500 ₹8,850 | 5,500 ₹6,490 |
| 1.30 | Fabrication of Pedestal as per site requirement to lay the lines | 2 | MT | 4,200 ₹4,956 | 12,000 ₹14,160 | 4,200 ₹4,956 | 2,000 ₹2,360 Lowest |
| 1.40 | Shifting of MS ERW pipes from site store/ O&M(store)2 upto the work place | 600 | Mtrs | 9,600 ₹11,328 | 3,000 ₹3,540 Lowest | 10,200 ₹12,036 | 9,600 ₹11,328 |
| 2.10 | Replacement of 250/300NB of HP water Line /DCW pipe line at 10 mtr height. | 800 | Mtrs | 1,28,000 ₹1,51,040 | 1,24,000 ₹1,46,320 Lowest | 1,26,400 ₹1,49,152 | 1,36,000 ₹1,60,480 |
| 2.20 | Fabrication of 45/70/90 degree bend as per site requirement for both water pipe line. | 10 | Nos | 14,800 ₹17,464 | 10,000 ₹11,800 Lowest | 13,000 ₹15,340 | 19,000 ₹22,420 |
| 2.30 | Fitting of Valves as per site requirement | 4 | Nos | 7,920 ₹9,345.6 | 8,000 ₹9,440 | 6,000 ₹7,080 Lowest | 6,200 ₹7,316 |
Tender Value
₹3.1 L
EMD Value
₹6,200
Closing Date
13 May 2024, 3:00 pmClosed
CE Gen
STPS Sarni
Work of laying, extension, diversion and replacement of MSERW/MS pipes of ash disposal line, HP water lines, DCW pump lines of unit 10 and 11 of STPS Sarni
2024_MPPGC_328292_1
WT-4539
Open Tender
Miscellaneous Works
Item Wise
545 days
work
As per NIT
8 documents required · 8 mandatory
₹500
Yes
₹6,200
Yes
9 Sept 2025
29 Feb 2024
16 May 2024
29 Feb 2024
13 May 2024
29 Feb 2024
Laying, Extension & Diversion of MS ERW pipe of size 300 NB at bottom ash discharge end at ASH BUND.
Fabrication of 45/70/90 degree bend as per site requirement from 300 NB MS ERW pipe
Fabrication of Pedestal as per site requirement to lay the lines
Shifting of MS ERW pipes from site store/ O&M(store)2 upto the work place
Replacement of 250/300NB of HP water Line /DCW pipe line at 10 mtr height.
Fabrication of 45/70/90 degree bend as per site requirement for both water pipe line.
Fitting of Valves as per site requirement
SAI CONSTRUCTION
M/S NIGAM CONSTRUCTION
CAREWELL CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .