Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹15,349.20 (6.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.7 L+₹29,533.77 (12.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.0 L
EMD Value
₹5,980
Closing Date
5 Oct 2026, 4:00 pmClosed
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Construction of Community Sanitary Complex at Sadna Top, SM Hill Block Tangdar Pyt. Nachiyan
2026_PWDJK_326274_1
ENIT 73 RnB Div Tangdar 2026-27 RDD Tangdar
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
₹5,980
Yes
6 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge all kind of soil | 19.63 | Cum | 479.3 | ₹9,408.66 |
| 2 | p/l dry stone soling hand packed complete inclusive all leads lifts loading un loading cost and carriag eof materials form approved nearest source to site eof work complete | 1.92 | cum | 950 | ₹1,824 |
| 3 | Providing laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering all work upto plinth level with1:3:6 ( 1 cement 3 course sand 6 graded stone agg 20 mm nominal size | 5.31 | cum | 5,733.6 | ₹30,445.42 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 8.06 | cum | 7,571.55 | ₹61,026.69 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five leve | 5.64 | cum | 1,455.65 | ₹8,209.87 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.81 | cum | 7,788.4 | ₹6,308.6 |
| 7 | Reinforced cement concrete work in walls (any thickness), suspended floors, including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.1 | cum | 9,395.7 | ₹10,335.27 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more incl all carriage etc complete job. Incl all carriage | 191 | Kg | 123.2 | ₹23,531.2 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 5.85 | sqm | 718.2 | ₹4,201.47 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 16.89 | sqm | 286.35 | ₹4,836.45 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_1103318.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .