| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC | ₹5.3 L Quoted ₹5.4 L | 1 | Accepted-AOC Accept |
| Sl No | Description | Qty | Unit | MARSTRONZ INFRA L1 |
|---|---|---|---|---|
| 1.00 | Removing the existing weathering course, clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification. | 165 | m2 | 67.32 ₹11,107.80 |
| 2.00 | P.C.C 1:2:4 using 6mm HBG metal for flooring screed concrete with floor finishing including cost of all materials lead, lift, labour charges etc., complete and as directed by engineer at site | 13 | m3 | 6,833 ₹88,829 |
| 3.00 | Chipping and Roughing the existing concrete surface and plastering of damaged ceiling with cement cement mortar 1:3, 20mm thick, including cost of all materials, scaffolding arrangement, lead, lift, labour charges etc., complete | 83 | m2 | 507 ₹42,081 |
| 4.00 | Supplying and fixing the in position using 110 mm dia PVC down fall pipe (4 kg/sq.cm)of approved make and quality conforming to the IS specification for rain water line including cost of PVC pipe,necessary PVC specials,GI clamp with lead lift as directed by the Engineer in charge etc..complete. | 6 | RM | 454 ₹2,724 |
| 5.00 | Earth work excavation in hard gravelly soil. Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. | 23 | m³ | 135 ₹3,105 |
| 6.00 | Plain cement concrete M15 with minimum cement content not less than 240 kgs using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 10 | m³ | 6,998 ₹69,980 |
| 7.00 | RCC in M25 with minimum cement content not less than 362 kgs using 12 to 20 mm HBG machine crushed metal for matt concrete with out form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) | 4 | m³ | 9,366 ₹37,464 |
| 8.00 | RCC in M25 with minimum cement content not less than 362 kgs using 12 to 20 mm HBG machine crushed metal for cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) Cable duct -cover slab | 2 | m³ | 9,366 ₹18,732 |
| 9.00 | Providing steel reinforcement MS/RTS rods up to 16 mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete | 0.45 | MT | 94,383 ₹42,472.35 |
| 10.00 | Labour charges for transporting of all types of cable duct cover slab to working site to curing tank, curing tank to keeping them alignment in position including lead, lift etc., complete. | 150 | Nos | 88 ₹13,200 |
Tender Value
₹4.5 L
EMD Value
₹5,400
Closing Date
11 Nov 2025, 2:00 pmClosed
SE/CEDC/SOUTH/CBE
O/O. SE/CEDC/SOUTH/CBE
providing Screed Concrete with floor finishing for Control Building open terrace and Providing New Cable Duct with Cover Slab at 110/22 KV SS Othakkalmandapam
2025_EB_618093_1
SE/CEDC/SOUTH/CBE/No.10/25-26
Open Tender
Civil Works - Buildings
120 days
Kuniyamuthur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,400
18 Dec 2025
28 Oct 2025
12 Nov 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_738708.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid