Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC AT GIRIMINT COLLIERY PO PARIHARPUR DIST PASCHIM BARDHAMAN PIN 713373 | PASCHIM BARDHAMAN | WEST BENGAL | 713373 | ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 L+₹20,457.32 (7.72%)Rejected-Finance 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹2.9 L+₹20,457.32 (7.72%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 L+₹27,665.63 (10.4%)Rejected-Finance | ₹2.9 L+₹27,665.63 (10.4%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ROY ENTERPRISE L2 | NEW ELECTRICAL CONCERN L3 | KANAK ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing/Rewinding of 600KVA, 11KV/550V Power Transformer of South Samla Colliery unit of MSAM Colliery Under Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | De-tanking of core & winding after removing of top cover | 1 | LS | 3,700 ₹3,700 | 3,750 ₹3,750 | 3,500 ₹3,500 Lowest |
| 1.02 | Removing of tap switch, top & winding. | 1 | LS | 2,600 ₹2,600 | 2,650 ₹2,650 | 2,500 ₹2,500 Lowest |
| 1.03 | New Electrolyte grade DPC coated copper conductor for replacement/brittle primary conductor & secondary
(Primary- 66 X 3)- 198Kg + (Secy- 48 X 3)- 144 Kg | 342 | KGS | 515 ₹1,76,130 | 525 ₹1,79,550 | 500 ₹1,71,000 Lowest |
| 1.04 | Cost of insulating materials for formation of Primary coil. | 1 | LS | 12,500 ₹12,500 Lowest | 12,680 ₹12,680 | 12,500 ₹12,500 Lowest |
| 1.05 | Cost of insulating materials for formation of Secy. coil. | 1 | LS | 12,350 ₹12,350 | 12,500 ₹12,500 | 11,950 ₹11,950 Lowest |
| 1.06 | Cost of insulating materials for assembling of core & winding | 1 | LS | 10,350 ₹10,350 | 10,500 ₹10,500 | 9,500 ₹9,500 Lowest |
| 1.07 | Cost of Silver brazing rod, Gasket joint, Bakelite tubes and other required Hardware materials. | 1 | LS | 9,100 ₹9,100 | 9,250 ₹9,250 | 8,500 ₹8,500 Lowest |
| 1.08 | Formation of Primary coils as per original shape & size. | 1 | LS | 11,540 ₹11,540 | 11,650 ₹11,650 | 11,500 ₹11,500 Lowest |
| 1.09 | Formation of Secondary coils as per original shape & size. | 1 | LS | 10,650 ₹10,650 | 10,750 ₹10,750 | 10,500 ₹10,500 Lowest |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
7 Mar 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing/Rewinding of 600KVA, 11KV/550V Power Transformer of South Samla Colliery unit of MSAM Colliery Under Pandaveswar Area
2026_ECL_354514_1
GM-PND/EandM/25-26/298/1653 dated 24/02/2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
MSAM Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,400
27 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
25 Feb 2026 - 28 Feb 2026
Repairing/Rewinding of 600KVA, 11KV/550V Power Transformer of South Samla Colliery unit of MSAM Colliery Under Pandaveswar Area. (Inclusive of EPF/CMPF)
De-tanking of core & winding after removing of top cover
Removing of tap switch, top & winding.
New Electrolyte grade DPC coated copper conductor for replacement/brittle primary conductor & secondary (Primary- 66 X 3)- 198Kg + (Secy- 48 X 3)- 144 Kg
Cost of insulating materials for formation of Primary coil.
Cost of insulating materials for formation of Secy. coil.
Cost of insulating materials for assembling of core & winding
Cost of Silver brazing rod, Gasket joint, Bakelite tubes and other required Hardware materials.
Formation of Primary coils as per original shape & size.
Formation of Secondary coils as per original shape & size.
Assembling of core & winding.
Improvement of I.R. Value.
Cost of new Bushing for assembling of L.T. side.
Re-fixing of bushing terminal with bushing of both side and necessary connections with winding of L.T. side.
Re-tanking of core & winding.
Reconditioning of Tap Ratio Switch.
Top up Transformer oil after de-hydration & filtration and testing of Transformer Oil.
Testing, Painting the Transformer.
Both side transportation including loading/unloading.
Less of copper scrap value
Overhead & Profit @ 10%
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_367335.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .