| 1 | L-1₹1.1 CrAccepted-AOC AMORE REBOOT KE SAMNE KRISHNA LUMENON UNNAO | UNNAO | UTTAR PRADESH | 209801 | ₹1.1 Cr | L-1 | Accepted-AOC Tender Accepted |
| 2 | L-2₹1.2 CrRejected-Finance 69 2 BAHRA SAUDAGAR PURVI NABIPURWA DHARAMSHALA ROAD DISTRICT HARDOI UTTAR PRADESH | HARDOI | UTTAR PRADESH | 209869 | ₹1.2 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.3 CrRejected-Finance | ₹1.3 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.3 CrRejected-Finance | ₹1.3 Cr | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.3 CrRejected-Finance | ₹1.3 Cr | L-5 | Rejected-Finance L-5 |
Tender Value
₹1.3 Cr
EMD Value
₹8.7 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE, Unnao Circle, Unnao
SE, Unnao Circle, Unnao
Construction of Biharikhera missing link road
2026_CEUCZ_1121808_5
1002MT/1MT/E-Tender/UC/2025-26 date27-02-2026
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹8.7 L
Yes
23 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Including labour Cess & Excluding GST)
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying and spreading Material on a prepared sub base,cement@4% by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to for
Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density (Including labour Cess & Excluding GST)
Construction of shoulder with approved material obtaind from borrow pits with all lift and lead transportion to site spreading grading to required slop and compacting to meet requirement of table 300.1and 300.2 as per technical specification clause 301.5
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared ba
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.(Including Labour Cess And Excluding G.S.T.)
Const of 1000mm hume pipe culvert
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(Including Labour Cess And Excluding G.S.T.)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets1000.00mm(Including Labour Cess And Excluding G.S.T.)
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar.(Including Labour Cess And Excluding G.S.T.)
Road Furniture km stone bord
plastering Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3.(Including Labour Cess And Excluding G.S.T.)
Maintenance of constructed road for next five year after the actual date of complition. The Contractor shall be paid total maintenance cost as Rs. 8072533 for five year in the form of installment as given below. Payment shall be done as per PWD Specification (Rates are including labour Cess but Exculiding GST) 1 st to 2nd Year after the Actual Date of Completion Maintenece @ 0.75% of Rs.
(ii) IInd year to IIIrd year 1.5% of Rs.
(iii) IIIrd year to IVth year 2.25% of Rs.
(iv) IVth year to Vth year 3% of Rs.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_2087646.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid