| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.9 Cr+₹16.0 L (2.38%)Admitted-Finance | ₹6.9 Cr+₹16.0 L (2.38%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 Cr+₹33.1 L (4.93%)Admitted-Finance | ₹7.0 Cr+₹33.1 L (4.93%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABDULLAH L1 | M/s NAWANG THOGMET L2 | ZAKIR HUSSAIN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator ) over areas ( exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth up-to 50 mtr and lift up to 1.5 mtr, disposed earth to be leveled and neatly dressed in: All kinds of soil | 10,967.33 | Cum | - | - | - |
| 2.00 | Dry stone pitching( any thickness) excluding cost of stones on Horizontal Complete job. | 400.79 | Cum | - | - | - |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc.Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m. | 10,967.33 | Cum | - | - | - |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to the plinth level. 1:4:8(1 cement:4 coarse sand :8 graded stone aggregate 40 mm nominal size). Crushed carriage of material up to site of work Complete job. | 24 | Cum | - | - | - |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to the plinth level. 1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size.Crushed Carriage of material up to site of work Complete job. | 45 | Cum | - | - | - |
| 6.00 | Providing and laying cement concrete in retaining walls, returnwalls, wall (any thickness ) including attached pilasters, columns, piers, abutmens, pillars posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. upto floor five level, excluding the cost of centering, shuttering and finishing. 1:3:6( 1cement :3 coarse sand :6graded stone aggregrate 40 mm nominal size.) Crushed Carriage of material up to site of work Complete job. | 5,638.88 | Cum | - | - | - |
| 7.00 | Centering and shuttering including strutting propping etc and removal of from work for: Retaining walls, return walls ,walls (Any thickness) including attached pilasters ,buttresses, plinth and string courses fillets etc. | 12,129.92 | Sqm | - | - | - |
| 8.00 | Hand packing stone in gabion and including the cost of gabions carriage Complete job. | 1,175.04 | Cum | - | - | - |
| 9.00 | Supply of quarry stone for filling in to gabions including cost of stone and carriage complete job. | 822.52 | Cum | - | - | - |
Tender Value
₹5.8 Cr
EMD Value
₹11.7 L
Closing Date
26 Dec 2019, 4:00 pmClosed
ExecutEngineer I and F C Divsion Leh
I and F C Division Leh
Flood protection and training work at Saboo Nallah by way of channelization , earth work and construction of PCC retaining walls and Gabions at RD 2893.27 to 3597.19 mtr (Under Languishing
2019_PWDJK_88581_3
26 of InFC division Leh 2019-20
Open Tender
Civil Works
Item Rate
180 days
leh
Please refer Tender documents.
8 documents required · 8 mandatory
₹4,000
Yes
Executive Engineer I and F C Divsion Leh
₹11.7 L
Yes
17 Jan 2020
20 Dec 2019
30 Dec 2019
20 Dec 2019
26 Dec 2019
20 Dec 2019
Amount
Earth work in excavation by mechanical means (hydraulic excavator ) over areas ( exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth up-to 50 mtr and lift up to 1.5 mtr, disposed earth to be leveled and neatly dressed in: All kinds of soil
Dry stone pitching( any thickness) excluding cost of stones on Horizontal Complete job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc.Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to the plinth level. 1:4:8(1 cement:4 coarse sand :8 graded stone aggregate 40 mm nominal size). Crushed carriage of material up to site of work Complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to the plinth level. 1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size.Crushed Carriage of material up to site of work Complete job.
Providing and laying cement concrete in retaining walls, returnwalls, wall (any thickness ) including attached pilasters, columns, piers, abutmens, pillars posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. upto floor five level, excluding the cost of centering, shuttering and finishing. 1:3:6( 1cement :3 coarse sand :6graded stone aggregrate 40 mm nominal size.) Crushed Carriage of material up to site of work Complete job.
Centering and shuttering including strutting propping etc and removal of from work for: Retaining walls, return walls ,walls (Any thickness) including attached pilasters ,buttresses, plinth and string courses fillets etc.
Hand packing stone in gabion and including the cost of gabions carriage Complete job.
Supply of quarry stone for filling in to gabions including cost of stone and carriage complete job.
M/s NAWANG THOGMET
ZAKIR HUSSAIN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_166344.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .