Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC H 11 HOUSING BOARD UNIT MADHAYANKUTTAI P O METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹4.7 L Quoted ₹4.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.8 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹4.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | KPRABHAKARAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for de-coupling and releasing FD fan motor from its bed with motor roof, motor bolts arresting, removal of fan DE bearing pedestal, DE bearing housing, DE bearing, removal of coupling by oil heating, shaft cover, IGV three blades, impeller, bolts, impeller arresting, removal of NDE bearing grease pipe, NDE bearing end cover, NDE bearing housing, NDE bearing, moving of shaft towards NDE side and arresting. | 1 | No. | 1,06,895 ₹1.1 L | 1,02,250 ₹1.0 L |
| 2.00 | Cleaning of FD fan DE bearing mounting area, NDE bearing mounting area and impeller mounting area, blue matching of NDE bearing housing with pedestal, blue matching of DE bearing housing with pedestal and leveling. | 1 | No. | 1,26,995 ₹1.3 L | 1,21,475 ₹1.2 L |
| 3.00 | Moving of shaft towards FD fan NDE side, tightening the impeller, moving of shaft towards DE side, mounting of new DE bearing and new NDE bearing on shaft, mounting impeller on shaft, mounting of DE bearing housing, NDE Bearing housing on shaft, positioning, oil heating of coupling and then mounting, mounting of IGV three blades. | 1 | No. | 1,10,060 ₹1.1 L | 1,05,280 ₹1.1 L |
| 4.00 | Charges for alignment of FD fan DE bearing, checking face out, clearance, alignment of NDE bearing, checking face out, clearance, alignment of impeller, alignment of IGV assembly with shaft, re-mounting of impeller housing, re-mounting of motor, motor roof, greasing DE bearing, NDE bearing, IGV assembly. Coupling of fan with motor, trial run. | 1 | No. | 1,26,995 ₹1.3 L | 1,21,475 ₹1.2 L |
| 5.00 | Consumable Charges for S.No.1 to 4. | 1 | LS | 4,440 ₹4,440 | 4,250 ₹4,250 |
Tender Value
Refer Docs
EMD Value
₹4,400
Closing Date
22 Oct 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III FD Fan 3B Replacement of worn out Fan drive End bearing and Non drive end bearing and other related works
2025_EB_612496_1
CE / MTPS-I / SE / M-I / BM /OT.303/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,400
Yes
29 May 2026
8 Oct 2025
23 Oct 2025
8 Oct 2025
22 Oct 2025
8 Oct 2025
Amount
Charges for de-coupling and releasing FD fan motor from its bed with motor roof, motor bolts arresting, removal of fan DE bearing pedestal, DE bearing housing, DE bearing, removal of coupling by oil heating, shaft cover, IGV three blades, impeller, bolts, impeller arresting, removal of NDE bearing grease pipe, NDE bearing end cover, NDE bearing housing, NDE bearing, moving of shaft towards NDE side and arresting.
Cleaning of FD fan DE bearing mounting area, NDE bearing mounting area and impeller mounting area, blue matching of NDE bearing housing with pedestal, blue matching of DE bearing housing with pedestal and leveling.
Moving of shaft towards FD fan NDE side, tightening the impeller, moving of shaft towards DE side, mounting of new DE bearing and new NDE bearing on shaft, mounting impeller on shaft, mounting of DE bearing housing, NDE Bearing housing on shaft, positioning, oil heating of coupling and then mounting, mounting of IGV three blades.
Charges for alignment of FD fan DE bearing, checking face out, clearance, alignment of NDE bearing, checking face out, clearance, alignment of impeller, alignment of IGV assembly with shaft, re-mounting of impeller housing, re-mounting of motor, motor roof, greasing DE bearing, NDE bearing, IGV assembly. Coupling of fan with motor, trial run.
Consumable Charges for S.No.1 to 4.
THIAGARAJAN ENGINEERING CONTRACTOR (BID ID -1488295)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_731864.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid