Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance | ₹6.9 L | L1 | Accepted-Finance Quoted Amount less than estimate |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance Quoted Amount More than estimate |
| Sl No | Description | Qty | Unit | MANIKANDAN D L2 | KAY ORR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kariyamedai at Uppukara kulam in Mathur Panchayat | |||||
| 1.11 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 14.64 | Cum | 263.78 ₹3,861.74 | 263 ₹3,850.32 |
| 1.12 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 7.46 | Cum | 5,360.81 ₹39,991.64 | 5,360.81 ₹39,991.64 |
| 1.13 | R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 12.47 | Cum | 9,086.46 ₹1.1 L | 9,086.46 ₹1.1 L |
| 1.14 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. | 28.64 | Sqm | 547.5 ₹15,680.40 | 547.5 ₹15,680.40 |
| 1.15 | Above GL | 70.71 | Sqm | 1,095 ₹77,427.45 | 1,095 ₹77,427.45 |
| 1.16 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification. | 0.83 | MT | 91,873.22 ₹76,254.77 | 91,873.22 ₹76,254.77 |
| 1.17 | Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification. | 13.37 | Cum | 6,068.2 ₹81,131.83 | 6,068.2 ₹81,131.83 |
| 1.18 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 1.43 | Cum | 6,654.24 ₹9,515.56 | 6,654.24 ₹9,515.56 |
| 1.19 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 29.58 | Sqm | 308.85 ₹9,135.78 | 308.85 ₹9,135.78 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
5 Mar 2026, 4:00 pmClosed
Block Development office(V.pt), Vembakkam
Block Development office, Vembakkam
Excecution of Village Panchayat Fund 2025-2026 Construction of Kariyamedai at Uppukarakulam in Mathur Panchayat in Vembakkam Block
2026_RDTN_667021_1
A6/104/2026 Date.23.02.2026
Open Tender
Civil Works - Others
Block Development office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
25 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Construction of Kariyamedai at Uppukara kulam in Mathur Panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Above GL
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_801328.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid