Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC As per BOQ | |
| 2 | L2₹11.9 L+₹22,954.09 (1.96%)Rejected-AOC | L2 | Rejected-AOC As per BOQ |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
27 Feb 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive engineer
executive engineer irrigation div gkp
RECONSTRUCTION OF VRB ( BRICK CULVRT ) AT KM 0.000 ON NAVAPAR DY
2021_UPIDC_554822_25
04/EEID/2020-21
Open Tender
Civil Works
Item Wise
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹24,000
Yes
29 Nov 2021
22 Feb 2021
27 Feb 2021
22 Feb 2021
27 Feb 2021
22 Feb 2021
90 days
Amount
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road and removing the diversion after work, including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying C.C. 1:4:8 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and old brick ballast and usable malba ( Collected from dismantaling of old DRB/VRB) including all cost of materials,T&P and labours and other accessories required.
Laying C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
Bending, binding cutting placing in position rainforcement steel including cost of binding wire and tack wilding with material. and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Laying C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) Wearing coat 75mm thick top of the slab and parapet. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Cemet Struck Deep Pointing 1:2 CM on Brick Masonary upto 3m height including cost of all material ,labour, t&p etc. required for proper completion of work.
Providing one coat of bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc.
Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
Dry brick on Edge Pitching including prepration of sub-grade to prescrib Slop ,filing joint with mortor T&P etc.
Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work
Sing borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK.
M/s ADARSH ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .