Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹61,000
Closing Date
9 Jul 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O IRRIGATION LADH NAZIR AHMAD BHAT BHAT TO OTHERS PYT HALQA SAGAM A BLOCK SAGAM
2022_RDPR_176143_5
ENIT89of2022-23
Open Tender
Civil Works
Item Rate
30 days
anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
Exempted
11 Jul 2022
25 Jun 2022
11 Jul 2022
25 Jun 2022
9 Jul 2022
25 Jun 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1m from cutting edge as directed:
Providing, supplying laying and filling including hand packing in foundation and plinth dry stone soling with all leads , lifts carriages from dumping site to source of work complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size crushed aggregate)
placing and laying of plum in concrete
Centering and shuttering including strutting, propping etc. and removal of form work for: walls
carriage of sand and stone aggregate from an average 10Kms by MT from source to site and 100mtr by H/L
carriage of stone soling plum from an average 5Kms by MT from source to site and 100mtr by H/L
carriage of cement from an average 2Kms by MT from source to site and H/L 100mt
Provision for signboard, plastering photographs and other unforeseen items(STA)
Nazir Ahmad Sheikh
AABID AHMAD KHANDAY
ALI MOHAMMAD BHAT
UMMER FAROOQ
MANZOOR AHMAD WANI
M.Y WANI
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .