Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC WEST BENGAL WB | KALIMPONG | WEST BENGAL | 734008 | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹1,203.34 (0.81%)Rejected-Finance IC 2 ASWANI NAGAR BAGUIHATI KOLKATA 700059 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700059 | ₹1.5 L+₹1,203.34 (0.81%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 L+₹2,272.98 (1.53%)Rejected-Finance | ₹1.5 L+₹2,272.98 (1.53%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.5 L
EMD Value
₹2,975
Closing Date
27 Jan 2026, 2:00 pmClosed
EE, JNNURM-II, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER, JNNURM-II, E-MSECTOR, K.M.D.A. UNNAYANBHAVAN, 6th FLOOR, SALT LAKECITY, KOLKATA 700091.
Overhauling, repairing of horizontal centrifugal pump no. 2 (360 m3/hr discharge, 55 m Head) at Garpha Clear water pumping station, Howrah, Under JNNURM-II division, EM sector, KMDA.
2025_KMDA_980609_1
EE(E/M)/JNNURM-II /KMDA/2W-12/25-26/362 Dt. 26/12/2025
Open Tender
Electrical Work/ Equipment
Percentage
15 days
Garpha
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,975
OFFICE OF THE EXECUTIVE ENGINEER, JNNURM-II
14 Sept 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
20 Jan 2026
Maintenance and overhauling of horizontal centrifugal pump pumps as per manufacturers instruction manual with all tools, tackles etc. This job includes labour charges, consumables like O - ring, sundry cleaning material etc. This job includes dismantling of all sub assemblies such as cooling pipes, bearing housing, stuffing box, shafts, bowl assembly, bell mouth, strainer etc. Reconditioning of all parts, inspection of all parts & replace these parts as per instructions (spare cost excluded) straighthening of shaft & refitting of all parts & sub assemblies with proper alignment including motor removing & refixing, test & trial for 24 hrs. complete. Capacity above 2 cusec upto 5 cusec pump
Transportation charges for taking the pump entire assembly to the work shop where the rectification work will be done as per direction of EIC & viceversa.
Supply, delivery of SKF bearing as per sample and direction of EIC (bearing no.6311-2Z).
S& D shaft sleeve as per sample and direction of EIC. (Material: ST ASTM 276-316 ANLD).
Supply and delivery of impeller casing ring of pump.
S&D of M.S Bolt/Nut/Washer (Black). for the above work.
supply, delivery of pump shaft (Material: ST ASTM 276-316 ANLD). Measurement taken from Analysis sheet.
Dynamic balancing of casting impeller fitted with shaft with proper care as per TS and direction of EIC
Deduct: 5 % scrap value for item no: 3 to 7
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Docs10_JN2.pdf
Tender Documents • 1.11 MB
BOQ_2391001.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .