| Sl No | Description | Qty | Unit | Kumar L1 | A M Hari L2 |
|---|---|---|---|---|---|
| 1.00Arakkonam Block | |||||
| 2.001. Strengthening the Road from Arakkonam Sholinghur Road to kainoor for Km 0/0-1/740 Km (R 25) | |||||
| 3.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp | 2,505.6 | sqm | - | - |
| 4.00 | Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete | 1,756.67 | sqm | - | - |
| 5.00Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A | |||||
| 6.00 | KM 0/0 -1/0 | 60 | Cum | - | - |
| 7.00 | KM 1/0 -1/740 | 44.4 | Cum | - | - |
| 8.00Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete | |||||
| 9.00 | KM 0/0 -1/0 | 90 | Cum | - | - |
| 10.00 | KM 1/0 -1/740 | 44.4 | Cum | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
6 Oct 2020, 3:00 pmClosed
Project Director,
DRDA,Ranipet
Ranipet District Strengthening of 4 Nos of Roads in Arakkonam Block TNRRIS 2020-21 80 percentage Component of CGF Distributed to DPC Package no.1
2020_RDTN_179435_1
A10-462 Dated 10.09.2020
Open Tender
Civil Works
Item Rate
180 days
DRDA, Ranipet
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.1 L
14 Oct 2020
16 Sept 2020
6 Oct 2020
16 Sept 2020
6 Oct 2020
16 Sept 2020
Amount
Arakkonam Block
1. Strengthening the Road from Arakkonam Sholinghur Road to kainoor for Km 0/0-1/740 Km (R 25)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
2. Strengthening the Road from WSA road to RN kandigai for Km 0/0-2/100 Km (R 18)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
3. Strengthening the Road from Ragavendranagar to vaniyambettai road for Km 0/0-1/00 Km (R 140)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
4. Strengthening the Road from Balakrishnapuram ADC to kumminipettai for Km 0/0-1/00 Km (R 95)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
A M Hari
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_215031.xls
BOQ • 0.27 MB
1.Technicalbid.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .