Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.0 LAccepted-AOC VILLAGE CHALKARI BASTI PO CHALKARI PS PETERWAR BOKARO JHARKHAND 829114 | PETERWAR | BOKARO | JHARKHAND | 829114 | L1 | Accepted-AOC ok | |
| 2 | L2₹50.2 L+₹15,060 (0.30%)Rejected-AOC DUGDA BASTI BRAHMAN TOLA DUGDSA COAL WASHERY KARMATAND BOKARO | BOKARO | JHARKHAND | 825102 | L2 | Rejected-AOC ok | |
| 3 | Rejected-Technical BOKARO | JHARKHAND | 825102 | - | Rejected-Technical Not Qualified |
Tender Value
₹50.2 L
EMD Value
₹1.0 L
Closing Date
21 Oct 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, R.D.Spl.Div. Bokaro
O/o Executive Engineer, R.D.Spl.Div. Bokaro 1st floor, working womens hostel, Camp-II, B.S. City, Bokaro-827001
Construction of green room (22 X 35 Male and Female) cum Stage (G plus 1) in field querry ground of ward number -04 in Phusro Nagar parishad in Bermo Block of Bokaro District
2026_RDSPL_119666_1
RDD/SD/BOKARO/10/2026-27/GR-02
Open Tender
Civil Works - Buildings
Works
180 days
Bermo
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹1.0 L
23 Nov 2026
7 Oct 2026
23 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts , levelling , ramming the foundation trenches , removing roots of trees , shrubs all compete as per approved design , building specification and direction of E/I. (JH BCD 2022/5.1.1) | 78.61 | M3 | 151.89 | ₹11,940.07 |
| 3 | Providing coarse clean sand in filling or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all material , lobour , royality and taxes all complete as per building specifiction and direction of E/I (Mode of measurment compacted volume)(JH BCD 2022/5.1.10) | 4.78 | M3 | 589.76 | ₹2,819.05 |
| 4 | Providing designation 75 B one brick flat soiling filled with local sand including cost of watering taxes royalty all complete as per building specification anddirection of E/I(JH BCD 2022/5.6.3) | 60.19 | M2 | 330.48 | ₹19,891.59 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)(5.3.1.4/BCD 2022) | 6.05 | M3 | 4,127.18 | ₹24,969.44 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:2:4 (1 cement : 2coarse sand (zone-III): 4 graded stone aggregate 40 mm nominal size).(5.3.1.2) | 1.37 | M3 | 4,600.21 | ₹6,302.29 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)( JH BCD/2022/5.3.9.1) | 25.47 | M3 | 5,218 | ₹1,32,902.46 |
| 8 | Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I.JH BCD 2022/5.2.6) | 13.24 | M3 | 5,112.46 | ₹67,688.97 |
| 9 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I.(JH BCD 2022/5.2.14) | 48.72 | M3 | 5,246.34 | ₹2,55,601.68 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)JH BCD 2022/5.3.10) | 10.65 | M3 | 6,085.07 | ₹64,806 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_161932.xls
BOQ • 0.29 MB
bidding_document.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .