Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical all criteria fulfilled |
| 2 | Rejected-Technical | Rejected-Technical has not uploaded Mandatorlly disclose the Bank Account No. linked with GSTIN as per clause SBD Cover-l (3). Besides the bidder has uploaded the Enlistment of Contractor as E class with tendering limit of Rs. 25.00 lacs. |
| 3 | Rejected-Technical | Rejected-Technical average annual financial turnover not as per Cl. 7 of SBD, GSTN no. suspended,GSTIN no mentioned is different from GSTIN no submitted for bid |
| 4 | Rejected-Technical | Rejected-Technical has not uploaded TR as per cl.1 of SBD, GSTR-3B as per cl. 4 of SBD, Bank Account No. linked with GSTIN s per clause SBD Cover-l (3), Turnover Certificate as per cl. 7 of SBD. MSME uploaded which does not qualify |
| 5 | Rejected-Technical KHUNMOH SRINAGAR SRINAGAR SRINAGAR JAMMU KASHMIR 190001 | SRINAGAR | JAMMU AND KASHMIR | 190001 | Rejected-Technical has not uploaded Profit and Loss Statement, Balance Sheet, Auditors report for the year 2021-22 as per cl. 3 of SBD. Hence the bid of the bidder has been assessed as NonResponsive. |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
19 Jun 2026, 6:00 pmClosed
Executive Engineer RnB div Zainapora
zainapora
Design, Construction, Planning, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) of 130 KLD Capacity based on MBBR-Technology on EPC Mode including operation and maintenance for Two Years at Transit Accommodation P_I
2026_PWDJK_311235_1
18/ZNP/RnB/e-Tendering/2026-27
Open Tender
Civil Works
Percentage
180 days
Allowpora Zainapora Shopian
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,600
Executive Engineer RnB div Zainapora
₹3.1 L
office of the Std. Er. PW(RnB) Circle Pul-Spn
24 Jul 2026
30 May 2026
20 Jun 2026
30 May 2026
19 Jun 2026
3 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Civil Work:-
Construction of Bar Screen Chamber, Oil and grease chamber, Equilisation Tank, Anoxic Tank, Sludge Holding Tank, Tube setting Tank, Filter Feed Tank, Filter Feed pump, Activated carbon filter, Screw Pump, Poly dosing System, Water storage tank including operator cum pannel room, sokage pit and STP pipe network including other ancillary civil works as per approved vetted drawings.
2. Electro-Mechanical Equipments:-
Design, supply, Construction, installation, testing, and commissioning of all electro-mechanical equipment required for the STP, including but not limited to pumps, blowers, mixers, diffusers,PSF, ACF, Disinfection, Dosing system, sludge handling systems, valves, actuators, instrumentation, automation, Control Panels, Servo, system piping, Lifting equipment and associated accessories, complete in all respects on EPC Mode. All equipment shall be suitably rated for the specified capacity and operating conditions, provided with necessary protections, and integrated with the electrical and PLC based automation system for efficient and reliable operation. The work shall also include all cabling, interconnections,earthing, supports,illumination and appurtenances required for a fully functional system, complete in all respects, in accordance with the Scope and Specifications given in Section B of Annexure C.
3. Operation & Maintenance (O&M):
Operation and maintenance of the 130 KLD STP for a period of 02 (two) years from the date of successful completion of 60 days Trial Run , including deployment of required manpower, supply of consumables and chemicals, routine maintenance, repairs, and upkeep of all civil, electro-mechanical, electrical, and automation systems. The Contractor shall ensure continuous and efficient operation of the plant, maintaining the specified effluent quality standards at all times, and shall hand over the plant in fully functional condition at the end of the O&M period complete in all respects, in accordance with the Scope and Specifications given in Section D of Annexure C. | 1 | CJ | 1,30,11,016.95 | ₹1,30,11,016.95 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_1007814.xls
BOQ • 0.28 MB
dateextensionNIT18.pdf
PDF • 0.23 MB
Addendum.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .