Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.3 LAccepted-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹97.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹97.4 LRejected-Finance ALAMPUR NODAKHALI | ₹97.4 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹97.5 LRejected-Finance 1 71 SREEMANTA DEY LANE KOLKATA 700012 W B | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹97.5 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | ORIENTAL ENGINEERING CO. H1 | S. P. CONSTRUCTION H2 | M/S.S.S.ENTERPRISE H3 |
|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | A] RAW WATER PUMPING STATION Labour charges for day to day operation of 3 nos. 250Kw capacity pumping machineries (max. two will be operated at a time and one will be stand by), operation of 3nos vacuum pumps and two nos dewatering pumps and other electrical/mechanical accessories including sweeping cleaning of pump house, toilets etc. by engaging skilled, semiskilled and un- skilled personnel in all 3 shifts as per direction of EIC. from 01-04-2025 to 31-03-2026 | 12 | Months | 3,22,600 ₹38.7 L | 3,22,300 ₹38.7 L | 3,22,290 ₹38.7 L |
| 3.00 | Routine and periodical maintenance of pumps, motors, AT-Starters, valves with actuators control desk, vacuum pumps, dewatering pumps, LT distribution panel boards, cables, tightening nut bolt of sluice valve, dismantling joints etc including replacement of control fuses, gland packing of pumps, approved quality lubricants for motor bearings, pump bearings etc. as per direction of EIC for a period of 12 months. | 1 | Lot | 5,86,100 ₹5.9 L | 5,85,600 ₹5.9 L | 5,85,398 ₹5.9 L |
| 4.00 | B] SUB STATION Labour charges for day to day round the clock operation of 33/6.6/0.433 KV sub station with outdoor type 25KA, 1250A, SF6 breaker, 7.5 MVA 33/6.6 KV 2 Nos outdoor typr transformer, 800 KVA 6.6/0.433 KV 3 Nos indoor type transformer, 1000 KVA 6.6/0.433 1 No. outdoor dry type transformer HV and LV panel boards, control panel board, on load tap changers including capacitor banks, 110 volt DC trip circuit with maintenance free batteries, battery charger, indoor type 800A, 25KA VCBs, 2000amp ACBs and other allied accessories including sweeping cleaning of sub-station’s switch yard, control room, office room, toilets etc. by engaging electrical supervisor, electrician etc. as per direction of EIC From 01-04-2025 to 31-03-2026 | 12 | Months | 2,81,500 ₹33.8 L | 2,81,400 ₹33.8 L | 2,81,200 ₹33.7 L |
| 5.00 | Routine and periodical maintenance of LT & HT panel board, cables, capacitors, transformers, battery with battery charger, CTs & PTs, earthing system, all breakers, on load tap changer, tightening nuts & bolts of bus bar, replacement of control Fuses, cleaning of Isolators etc. as per direction of EIC for a period of 12 months. | 1 | Lot | 5,86,100 ₹5.9 L | 5,85,600 ₹5.9 L | 5,85,398 ₹5.9 L |
| 6.00 | Servicing testing and calibration of the following IDMT, instantaneous and differential relays by any testing agency approved by WBSEDCL or Directt. of Electricity Board once in a year or as directed by EIC.
A] Non directional IDMT O/C and E/F with high set relays.
B] M-pact SCB’s release
C] Trans. Differential relays
D] All the auxiliaries relays
E] Bucholtz relay with alarm and trip
F] Shunt trip circuit
G] Alarm, trip and enunciator circuit
H] Calibration of all meters
Test results to be submitted. | 1 | Lot | 5,86,100 ₹5.9 L | 5,85,600 ₹5.9 L | 5,85,398 ₹5.9 L |
| 7.00 | Servicing and testing of all outdoor and indoor type SF6, VCBs and ACBs including Raw Water VCB, HV and LV panel boards, checking complete wiring of CTS, PTS with insulations, checking instrumentation panels, checking cleaning of bus bars (both HT<), LT feeders and the contacts by any testing agency approved by the WBSEDCL or Directorate of Electricity Board once in a year or as directed by EIC. | 1 | Lot | 5,86,100 ₹5.9 L | 5,85,600 ₹5.9 L | 5,85,398 ₹5.9 L |
| 8.00 | Routine and periodical maintenance of LT panel board, cables, star delta starter, CTs, PTs, earthing system, all ACBs including tightening nuts & bolts of bus bar, cleaning of all contactor, replacement of indicating lamp and fuses etc as per direction of the EIC of filter house
from 01-04-2025 to 31-03-2026 | 12 | Months | 11,200 ₹1.3 L | 10,900 ₹1.3 L | 10,825 ₹1.3 L |
| 9.00 | Servicing and testing of all ACBs including LT panel board, checking of complete wiring of CTs and PTs with insulation of bus bar, regressing the contacts and one time calibration of the following relays and meters within ten days of contracts as directed by the EIC [for blower & compressor] of filter house
a) All O/c, U/V, S/C relays
b) Calibration of all meters
c) ACBs shunt trip circuit | 1 | Lot | 18,900 ₹18,900 | 18,600 ₹18,600 | 18,573 ₹18,573 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
13 Mar 2025, 6:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and maintenance of Raw water pumping Station, 33KV/ 6.6 KV/ 0.433 KV substations at D. Roypure under Arsenic Affected Area Surface Based water supply Project in South 24pgs district under S.24pgs Mechanical Division, PHE Dte.
2025_PHED_812086_12
WBPHE/EE/SMD/NIeT-89 of 2024-25
Open Tender
Electrical Work/ Equipment
365 days
D. Roypure
Please refer Tender documents.
8 documents required · 8 mandatory
₹1.9 L
8 May 2026
21 Feb 2025
17 Mar 2025
21 Feb 2025
13 Mar 2025
21 Feb 2025
Amount
A] RAW WATER PUMPING STATION Labour charges for day to day operation of 3 nos. 250Kw capacity pumping machineries (max. two will be operated at a time and one will be stand by), operation of 3nos vacuum pumps and two nos dewatering pumps and other electrical/mechanical accessories including sweeping cleaning of pump house, toilets etc. by engaging skilled, semiskilled and un- skilled personnel in all 3 shifts as per direction of EIC. from 01-04-2025 to 31-03-2026
Routine and periodical maintenance of pumps, motors, AT-Starters, valves with actuators control desk, vacuum pumps, dewatering pumps, LT distribution panel boards, cables, tightening nut bolt of sluice valve, dismantling joints etc including replacement of control fuses, gland packing of pumps, approved quality lubricants for motor bearings, pump bearings etc. as per direction of EIC for a period of 12 months.
B] SUB STATION Labour charges for day to day round the clock operation of 33/6.6/0.433 KV sub station with outdoor type 25KA, 1250A, SF6 breaker, 7.5 MVA 33/6.6 KV 2 Nos outdoor typr transformer, 800 KVA 6.6/0.433 KV 3 Nos indoor type transformer, 1000 KVA 6.6/0.433 1 No. outdoor dry type transformer HV and LV panel boards, control panel board, on load tap changers including capacitor banks, 110 volt DC trip circuit with maintenance free batteries, battery charger, indoor type 800A, 25KA VCBs, 2000amp ACBs and other allied accessories including sweeping cleaning of sub-station’s switch yard, control room, office room, toilets etc. by engaging electrical supervisor, electrician etc. as per direction of EIC From 01-04-2025 to 31-03-2026
Routine and periodical maintenance of LT & HT panel board, cables, capacitors, transformers, battery with battery charger, CTs & PTs, earthing system, all breakers, on load tap changer, tightening nuts & bolts of bus bar, replacement of control Fuses, cleaning of Isolators etc. as per direction of EIC for a period of 12 months.
Servicing testing and calibration of the following IDMT, instantaneous and differential relays by any testing agency approved by WBSEDCL or Directt. of Electricity Board once in a year or as directed by EIC. A] Non directional IDMT O/C and E/F with high set relays. B] M-pact SCB’s release C] Trans. Differential relays D] All the auxiliaries relays E] Bucholtz relay with alarm and trip F] Shunt trip circuit G] Alarm, trip and enunciator circuit H] Calibration of all meters Test results to be submitted.
Servicing and testing of all outdoor and indoor type SF6, VCBs and ACBs including Raw Water VCB, HV and LV panel boards, checking complete wiring of CTS, PTS with insulations, checking instrumentation panels, checking cleaning of bus bars (both HT<), LT feeders and the contacts by any testing agency approved by the WBSEDCL or Directorate of Electricity Board once in a year or as directed by EIC.
Routine and periodical maintenance of LT panel board, cables, star delta starter, CTs, PTs, earthing system, all ACBs including tightening nuts & bolts of bus bar, cleaning of all contactor, replacement of indicating lamp and fuses etc as per direction of the EIC of filter house from 01-04-2025 to 31-03-2026
Servicing and testing of all ACBs including LT panel board, checking of complete wiring of CTs and PTs with insulation of bus bar, regressing the contacts and one time calibration of the following relays and meters within ten days of contracts as directed by the EIC [for blower & compressor] of filter house a) All O/c, U/V, S/C relays b) Calibration of all meters c) ACBs shunt trip circuit
S. P. CONSTRUCTION (BID ID -6211710)
M/S.S.S.ENTERPRISE (BID ID -6217515)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1820246.xls
BOQ • 0.34 MB
Testing_Maintainance.pdf
Tender Documents • 0.06 MB
Technical_Specification.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid