Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 292C FRIENDS COLONY ETAWAH | L1 | Admitted-Finance | ||
| 2 | L1₹1.6 CrAdmitted-Finance GALI NO 5 PUNJABI COLONY MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | L1 | Admitted-Finance | ||
| 3 | L1₹1.6 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹1.6 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹1.6 CrAdmitted-Finance KARAHAL ROAD MAINPURI U P | MAINPURI | UTTAR PRADESH | 205001 | L1 | Admitted-Finance |
Tender Value
₹2.3 Cr
EMD Value
₹13.3 L
Closing Date
5 Oct 2026, 12:00 pmClosed
SE
Mainpuri Circle Mainpuri
New Construction of Nagla Akhai to Bamba ki parti ke Kinare Dulhapur road
2026_CEAGR_1189267_6
3686/7M-MC/26-27 date 25-08-2026
Open Tender
Civil Works
Lump-sum
180 days
mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.3 L
Yes
13 Oct 2026
23 Sept 2026
5 Oct 2026
23 Sept 2026
5 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | cum | 95 | - |
| 2 | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per
Technical Specification Clause 303.1. | - | cum | 95 | - |
| 3 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase. | 1,560 | cum | 3,300 | ₹51,48,000 |
| 4 | Cement Treated Base / Providing, laying, spreading on a prepared sub base, cement@4% by weight to the spread material manully mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. / Quantity of cement assumed as 4 percent of Quantity by weight for base course. | 2,100 | cum | 3,700 | ₹77,70,000 |
| 5 | Providing and applying tack coat with bitumen (VG-10) at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per technical specification clause-503 | 15,000 | sqm | 26 | ₹3,90,000 |
| 6 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using V.G.-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades. as per Technical Specification clause-508 | 15,000 | sqm | 190 | ₹28,50,000 |
| 7 | Providing and laying seal coat by mechanical means with VG-10 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C as per Technical Specification clause-510 | 15,000 | sqm | 75 | ₹11,25,000 |
| 8 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. | - | cum | 150 | - |
| 9 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. | - | cum | 5,650 | - |
| 10 | Class-150 (Non Modular) brick work in 1:3 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | - | cum | 5,700 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.77 MB
BOQ_2240603.xls
BOQ • 0.34 MB
4112.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .