Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.4 L+₹1.2 L (4.51%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹27.7 L+₹1.4 L (5.39%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹28.0 L+₹1.8 L (6.72%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹28.1 L+₹1.9 L (7.21%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L5 | Rejected-Finance L5 |
Tender Value
₹32.6 L
EMD Value
₹66,000
Closing Date
10 Oct 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E.M.G.C.C.D-7 BIJNOR
E.E.M.G.C.C.D-7 BIJNOR
CONSTRUCTION OF V.R.B. AT KM. 10.800 Of PANWASA DY.
2022_UPIDC_731267_4
02/EE/2022-23
Open Tender
Civil Works - Canal
Item Rate
sambhal
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹66,000
Yes
28 Jan 2023
28 Sept 2022
11 Oct 2022
28 Sept 2022
10 Oct 2022
28 Sept 2022
28 Sept 2022 - 10 Oct 2022
90 days
Amount
Earth work in embankment in ordinary soil in 20 cm layer includinng ramming and dressing the surface to the required levels and slopes also including carriage 600 M up to work site withh lead and lift, complete as per directed by Engineer in charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
C.C 1:6:12 in over excavation portion including cost of material, labour and T&P etc. complete.
M-10 Cement concret including cost of material aboutment (1:3:6)
Brick work in 1:4 C.M includign cost of material, labour and T&P etc. complete.
Centering & Shuttering including all cost of material, labour and T&P etc.complete.
for CC work
For RCC work
Supply and laying reinforcemet in R.C.C Work with cutting, binding, & placing & all metirial & labour etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work .
M-20 C.C. Bearing cost including all cost of material, labour and T&P etc.complete.
Cement pointing in 1:2 (struck deep) i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. compiete.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Earth work in filling in ordinary soil with drressing i/c proper compaction
Brick on edge flooting including cost of material, labour and T&P etc. complete.
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete.
Removal of Diversion including all cost of material, labour and T&P etc. complete.
MOHAMMAD AWAIS
M/S VIPIN KUMAR CONTRACTOR
JS cONSTRUCTIONS
MA AND SONS
Arvind Kumar
M/S BALAJI ENTERPRISES CONTRACTOR
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .