Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 CrAccepted-AOC WARD NO 1 P O P S BIJNI DIST CHIRANG PIN 783390 | CHIRANG | ASSAM | 783390 | ₹8.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.0 Cr+₹23.6 L (2.70%)Rejected-AOC R K PATH ITACHALI HOUSE NO 22 CITY TOWN NAGAON P O NAGAON P S SADAR DISTRICT NAGAON PIN 782003 | NAGAON | ASSAM | 782003 | ₹9.0 Cr+₹23.6 L (2.70%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical ASRAF ALI RONGAGORA HUJ PO HUJGAON PS SADAR DIST NAGAON PIN 782002 ASSAM | NAGAON | ASSAM | 782002 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹7.8 Cr
EMD Value
₹15.6 L
Closing Date
24 Jul 2024, 2:00 pmClosed
Chief Engineer (EAP), PWRD, Assam
O/o the Chief Engineer (EAP), PWRD, Assam, Fatasil Ambari, Guwahati-25
CE/EAP/ARRBP/OCB/Bridges-3/Karbi-Anglong/04 Construction of Bridges in Karbi-Anglong district i) Br on ParakhowaPanjuri Road via Haza Rongpi Gaon ii) Br 3/6 on DuporTimung Gaon to Dengaon iii) Br on Howraghat to Pub Gojalipara
2024_PWRDW_38064_11
CE/EAPARRBP111TENDERS2024PtI12
Open Tender
Civil Works - Bridges
Item Rate
900 days
Karbi-Anglong
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹15.6 L
Yes
O/o the Chief Engineer (EAP), PWRD, Assam
18 Jun 2025
18 Jul 2024
24 Jul 2024
18 Jul 2024
24 Jul 2024
18 Jul 2024
18 Jul 2024 - 19 Jul 2024
19 Jul 2024
Amount
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test iii) Br. on Howraghat to Pub Gojalipara
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) iii) Br. on Howraghat to Pub Gojalipara
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job iii) Br. on Howraghat to Pub Gojalipara
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) iii) Br. on Howraghat to Pub Gojalipara
Providing placing and driving in position for RCC piles 6mm permanent M.S Liner upto required depth including fabricating and setting out as per detailed drawing Dupor Timung gaon to Dengaon (Span 3 x 7.6)
Providing placing and driving in position for RCC piles 6mm permanent M.S Liner upto required depth including fabricating and setting out as per detailed drawing iii) Br. on Howraghat to Pub Gojalipara
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m iii) Br. on Howraghat to Pub Gojalipara
Levelling course for Pile cap i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Levelling course for Pile cap ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Levelling course for Pile cap iii) Br. on Howraghat to Pub Gojalipara
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Cement concrete for reinforced concrete in Pile cap & Tie Beams complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) iii) Br. on Howraghat to Pub Gojalipara
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in Foundation as per drawings and technical specifications Clauses 1000 and 1202 iii) Br. on Howraghat to Pub Gojalipara
Plain/Reinforced cement concrete,(Return wall/Retaining Wall Foundation & Stem, abutment shaft, pier, pier cap,& abutment cap) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara
Plain/Reinforced cement concrete,(U return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M25 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara
Plain/Reinforced cement concrete, (Pedestal & Sesmic Arrestor) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser RCC Grade M40 Using Batching Plant, Transit Mixer and Concrete Pump Height 5m to 10m iii) Br. on Howraghat to Pub Gojalipara
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, Riding Return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 iii) Br. on Howraghat to Pub Gojalipara
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br. on Howraghat to Pub Gojalipara
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material iii) Br. on Howraghat to Pub Gojalipara
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) Dupor Timung gaon to Dengaon (Span 3 x 7.6)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) iii) Br. on Howraghat to Pub Gojalipara
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. iii) Br. on Howraghat to Pub Gojalipara
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. iii) Br. on Howraghat to Pub Gojalipara
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department iii) Br. on Howraghat to Pub Gojalipara
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & RCC Cross Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Howraghat to Pub Gojalipara
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification iii) Br. on Howraghat to Pub Gojalipara
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. on Howraghat to Pub Gojalipara
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. iii) Br. on Howraghat to Pub Gojalipara
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications iii) Br. on Howraghat to Pub Gojalipara
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 iii) Br. on Howraghat to Pub Gojalipara
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications iii) Br. on Howraghat to Pub Gojalipara
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface iii) Br. on Howraghat to Pub Gojalipara
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). iii) Br. on Howraghat to Pub Gojalipara
Providing and fixing drainage spouts as per MORT & H specifications. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and fixing drainage spouts as per MORT & H specifications. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and fixing drainage spouts as per MORT & H specifications. iii) Br. on Howraghat to Pub Gojalipara
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 iii) Br. on Howraghat to Pub Gojalipara
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 iii) Br. on Howraghat to Pub Gojalipara
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 iii) Br. on Howraghat to Pub Gojalipara
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. iii) Br. on Howraghat to Pub Gojalipara
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 iii) Br. on Howraghat to Pub Gojalipara
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Dupor Timung gaon to Dengaon (Span 3 x 7.6)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. iii) Br. on Howraghat to Pub Gojalipara
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. iii) Br. on Howraghat to Pub Gojalipara
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Howraghat to Pub Gojalipara
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Howraghat to Pub Gojalipara
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. iii) Br. on Howraghat to Pub Gojalipara
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. iii) Br. on Howraghat to Pub Gojalipara
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 i) 600mm equilateral triangle iii) Br. on Howraghat to Pub Gojalipara
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iii) 800mm x 600mm rectangular iii) Br. on Howraghat to Pub Gojalipara
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) iii) Br. on Howraghat to Pub Gojalipara
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface iii) Br. on Howraghat to Pub Gojalipara
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. iii) Br. on Howraghat to Pub Gojalipara
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Air quality monitoring at 3 locations for 2seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Noise quality monitoring at 3Locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Howraghat to Pub Gojalipara
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Soil quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Howraghat to Pub Gojalipara
Cost of Training related to Capacity Building i) Br. No. 1/4 on Parakhowa Panjuri road via Haza Rongpi Gaon
Cost of Training related to Capacity Building ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
Cost of Training related to Capacity Building iii) Br. on Howraghat to Pub Gojalipara
A Provisional sum (fixed amount) for items of utility shifting & Tree Felling & Plantation of Rs. 5,62,695.00 (not to be changed by the Bidder in BOQ) ii) Br. No. 3/6 on Dupor Timung gaon to Dengaon
A Provisional sum (fixed amount) for items of Tree Felling & Plantation of Rs. 2,26,285.00 (not to be changed by the Bidder in BOQ) iii) Br. on Howraghat to Pub Gojalipara
UCN CONSTRUCTION COMPANY PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .