Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.3 CrAdmitted-Finance GALI NO 1 KRISHNA NAGAR MAINPURI | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 3 | L1₹1.3 CrAdmitted-Finance | -15.00% | ₹1.3 Cr | L1 | Admitted-Finance |
| 4 | Rejected-Technical B T F 1203 BETWA APARTMENT GOMATI NAGAR BISTAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | - | - | Rejected-Technical Technically Disqualify |
Tender Value
Refer Docs
EMD Value
₹9.7 L
Closing Date
18 Mar 2025, 3:00 pmClosed
Garden Superintendent
Lucknow Municipal Corporation
The work of development of park under Upvan Yojana in 6400.00 square meter area out of 0.640 hectare available at Gata No. 63 of village Bhaisora under Lucknow Municipal Corporation area.
2025_DOLBU_1010451_2
897/P/UDYAN/24-25
Open Tender
Miscellaneous Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,091
Lucknow Municipal Corporation
₹9.7 L
20 May 2025
24 Feb 2025
18 Mar 2025
24 Feb 2025
18 Mar 2025
24 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Boundarywall with Gate & Fencing Work - | - | - | - | - |
| 2 | E/W excavation in soil mixd with Moorum, shingle, Kankar etc. Requiring the use of special T & P. lift 1.50 mtr. & lead 30 mtr. etc.all complete (2.6.1) | 258.42 | m3 | 156 | ₹40,313.52 |
| 3 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:6:12 (1 cement : 6 coarse sand (zone-III) 12 graded brick aggregate 40 mm (norminal size) (pwd (sch)-273) | 27.77 | m3 | 4,553 | ₹1,26,436.81 |
| 4 | providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering and shuttering finishing and reinforcement all work upto plinth level 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size (5.1.3) | 45.12 | m3 | 7,340 | ₹3,31,180.8 |
| 5 | Structural steel work in single section fixed with of without connecting plate including cuting hoisting fixing in position and applying a priming coat of approved steel primer all complete (10.1) | 35.42 | m3 | 6,900 | ₹2,44,398 |
| 6 | Brick work with common burnt day ( non modular ) brick of class -150 in foundation and plinth in Cement morter 1:4 (1cement : 4 coarse sand) (6.1 6.1.1.) | 28.05 | m3 | 6,715 | ₹1,88,355.75 |
| 7 | Brick work with common burnt day ( non modular ) brick of class -150 in superstructure above plinth in Cement morter 1:4 (1cement : 4 coarse sand) 6.4 6.4.1. | 88.98 | m3 | 7,469 | ₹6,64,591.62 |
| 8 | 12 mm cement plaster of mix 1:4 ( 1 cement 4 coarse sand) (13.4.2) | 934.65 | m2 | 186 | ₹1,73,844.9 |
| 9 | Porviding and applying white cement based putty of average thik. 1 mm of approved brand and manufacturer etc all comp. (13.8) | 934.65 | m2 | 99 | ₹92,530.35 |
| 10 | Finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade. New work asian, baeger etc all comp. (13.47.1) | 934.65 | m2 | 123 | ₹1,14,961.95 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .