| 1 | 1₹3.9 LAccepted-AOC TUTICORIN | TIRUNELVELI | TAMIL NADU | 627001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹4.6 L+₹24,800 (5.72%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
₹5.4 L
EMD Value
₹5,400
Closing Date
9 Dec 2021, 2:00 pmClosed
CE / TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Boiler Cleaning of I pass Furnace II pass and Boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 2021 2022 overhaul
2021_EB_214533_1
CE/TTPS/SE / M-II/No.367/2021-22
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹5,400
Yes
18 Nov 2022
24 Nov 2021
10 Dec 2021
24 Nov 2021
9 Dec 2021
24 Nov 2021
DRUM overhauling: Charges for inspection of boiler drum, cleaning of internal components, patch welding of separation chamber cracks, overhauling of phosphate dozing line NRV etc including consumables
Charges for water washing of boiler inter-pass area (area inclusive of re-heater coils, water wall Screen tubes, S.H Screen tubes etc.)
Charges for water washing of boiler I pass water walls inclusive of gooseneck bends area through peepholes.
Charges for water washing of boiler II pass
Charges for removal of heavy lumps of shoot deposited on water walls and platen super heater coil tubes by using wire brushes/ scrapping with assistance of sky climber.
Charges for removal of heavy lumps of soot deposited on boiler Inter pass Re heater coil by using wire brushes/ scrapping with assistance of sky climber.
Charges for shifting the sky climber inside the furnace for access of Platen water wall, platen Super- heater coils, super heater roof and water wall areas
Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for cleaning of water wall in all sides of Boiler and removal of sky climber, return back to stores after completion of works.
Charges for leading lifting of scaffolding materials and erection of platform at S.H/W.W screen tube area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding
Charges for providing GI sheet/ MS sheet shield for 10.5 mt length inside Boiler inter pass Re Heater area to protect material falling from RH coil slop in to Boiler first pass and dismantling after completion of work and arranging polythene covers to Sky climber motor, sky lock etc. to protect damage from water and dust, cleaning falling soot particles from Sky climber bed during carrying out Jet cleaning work
Charges for providing refractory over the screen tube area, steam cooled wall front slope and other areas including transportation of refractory from stores and water from 0 m level to the required elevation, etc complete
Charges for cleaning of boiler structure up to 56M EL by water jet washing on all four sides
Charges for cleaning & Water washing the boiler ground floor area after over hauling of Boiler.
Charges for checking hinges, locking arrangements, reconditioning of the doors and providing asbestos ropes to all manhole door and peephole doors
THIAGARAJAN ENGINEERING CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .