| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹18.1 L+₹2.8 L (18.1%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹18.4 L+₹3.1 L (20.3%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹16.5 L
EMD Value
₹17,000
Closing Date
1 Dec 2020, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
TRANSPORTATION OF MATERIAL INCLUDING CHECK SURVEY, DISMANTLING OF TOWER, CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTHING ETC
2020_UPTCL_533186_1
E-Tender No. 45/2020-21/ETC/VNS
Open Tender
Electrical Works
Item Rate
50 days
132 KV Kursato-RKT line Under ETD-I, VNS
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹2,006
SE, ETC, Varanasi
₹17,000
26 Jun 2021
25 Nov 2020
2 Dec 2020
25 Nov 2020
1 Dec 2020
26 Nov 2020
Amount
Supply - Part-A
Tower Accessories
Earthing material(Pipe type)
Number plate
phase plate(set of three color red, blue and yellow)
Danger plate
Conductor Accessories for Panther Conductor
PA rod
Vibration damper
Double tension fitting complete in all respect for ACSR Panther conductor
Single tension fitting complete in all respect for ACSR Panther conductor
MS joint
Repairing sleeve
Ground wire Accessories for 7/10 SWGG.S earth wire.
MS joint
Tension clamp
Vibration damper
Copper bond
Work - Part-B
Survey
Check survey
Excavation of earth for 02 No. C +10 type tower as per profile and specification @222.913x2 M³ for each tower.
Shifting and loading of 02 Nos. C+10 type stub at EFU Naini. Transportation of the same from Naini to 132 KV Raja Talab substation. Unloading and shifting the same at Raja Talab substation.
Shorting of 02 Nos. C+10 type tower part mark wise including stub & templates at 132KV substation Raja Talab shifting of the same from stacking place to loading point and loading on private vehicle. Transportation from Raja Talab to Village Mehndiganj, unloading at site.
Stub setting for 2 No. C+10 type tower.
Concreting in ratio 1:2:4 for 02 Nos. C+10 type tower @ 54.610 M³/Tower Tower.
Reinforcement with M.S round bar as per specification for 132KV DC tower including cost of material.
A) Destringing of 3x1.886 Km ACSR panther conductor between loc. No. 08DB+5 & 13DB+5 safely and making role of the conductor and then carrying them safely to store and stacking properly.
B) Destringing of Earth wire 1.886 Km between loc. No. 07DB+5 & 10DC+0 safety and making role of the earth wire and then carrying them safety to store and stacking properly.
Dismantling of 01 No. A+0 type tower at loc. No. DA+5 type tower at location no. 10 by way of breaking tack welding and safely removing lattices structure and carrying the dismantled tower part from site to UPPTCL store including scrap nut and bolt & stacking properly.
Erection of 02 Nos. C+10 type 132 KV tower and their extensions including all wok above ground level excluding hoisting of insulators, hardware & accessories but including fitting of danger, number, phase plates fixing and punching.
Laying, stringing, tensioning, clamping, jointing, etc. of ACSR Panther conductor 3X1.886 Km.
Laying, stringing, tensioning, clamping, jointing, etc. of earth wire 7/10 SWG.
Pipe earthing.
Tack welding up to two sections of newly erected towers.
Shifting, loading of dismantled parts of 01 Nos. tower at site and transportation of same from Village Mehndiganj to 132KV substation Raja Talab Varanasi.
Grounding work including earth work etc for pipe earthing/grounding including cost of choke and salt.
M/S SHEKHAR ENGINEERING WORKS
Rama Power construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .