Loading…
Loading…
Tender Value
₹11.8 L
EMD Value
₹23,693
Closing Date
1 Aug 2026, 11:00 am6d left
Executive Engineer
HPPWD Division Chowari
Formation cutting and wire crate for dumping in Km 0/0 to 2/350
2026_PWD_139898_3
NIT No. 3617-3667 dated 22.07.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Chowari
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹23,693
24 Jul 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil ,ordinary roack,soft rock ,hard roack chieseling ,wedging out rock (where blasting is probihitted )and their intermediate classification of soil compelet including setting out true to the require lines,grades,width ,cutting and trimming of side slopes and levels as shown on the drawings and as direction of engineer-in-charge at site ,according to the technical specification section 300 and 1600 and sorting out useful material and stacking the same within all leads liftts in acquired width of road and transportation of un-usal materials for filling in roadway camber ,embankement for grade improvements abd disposal of all surplus material to dumping site is to be selected by the contractor at his own level in private land only through all modes of transportation including head load or animal transpot or mechanical means alongwith its leveling fine dressig and carriage of machineries material,tool ,equipment and safety measures and other incidental necessary to complete the work by contractor .Any loss to the public/private property during the course of execution shall be the absolute responsibilty of the contractor ,which shall have to be compensated by him in all cases.The removal of slips during the construction period shall be responsibillity of the contractor and nothing extra shall be paid on this account. The rate are including the octroi royality,Malkana toll tex,sales tax GST or any other taxes imposed by the Govt. | 2,935.07 | Per Cubic Metre | 218.66 | ₹6,41,782.41 |
| 2 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock, hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm (one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 28.7 | Per Cubic Metre | 559.1 | ₹16,046.17 |
| 3 | Providing and laying of boulder apron laid in wire crates with 4 mm (four milimetre) dia G.I wire conforming to IS: 280 and IS: 4826 in 100 mm x 100 mm (one hundred millimetre into one hundred millimetre) mesh (woven diagonally) including 10% (ten percent) extra for laps and joints laid with stone boulders weighting not less than 25 Kg (twenty five kilograme) each as per drawing technical specifications Clause 1301 and as per direction of Engineer-In-Charge including carriage of materails with in all leads, lifts and other incidentals. The rates are inclusive of the octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 171.88 | Per Cubic Metre | 3,065 | ₹5,26,812.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_207376.xls
BOQ • 0.32 MB
SBD3.pdf
Tender Documents • 3.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].