Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance | ₹6.4 L | L1 | Accepted-Finance Agreement With L1 |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance Agreement With L1 |
| 3 | L3₹7.1 LRejected-Finance | ₹7.1 L | L3 | Rejected-Finance Agreement With L1 |
| 4 | L4₹7.9 LRejected-Finance | ₹7.9 L | L4 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | DALMENDRA SINGH L2 | M/s CHANDRA PAL SINGH L1 | BIRAHAMPAL SINGH L4 | CHETAN ASSOCIATES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all types of soil including all lift and all lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge. | 82.52 | CUM | 80 ₹6,601.60 | 50 ₹4,126 | 90 ₹7,426.80 | 70 ₹5,776.40 |
| 2.00 | Centering and shuttering for RCC Work including rent of shuttering material, labour and T & P required for proper completion of the work . | 57.6 | SQM | 500 ₹28,800 | 300 ₹17,280 | 700 ₹40,320 | 700 ₹40,320 |
| 3.00 | Providing & laying C.C. ( A-40,M-10)(1:3:6) i/c all cost of material, labour and T&P etc complete. | 27.3 | CUM | 4,800 ₹1.3 L | 3,000 ₹81,900 | 5,290 ₹1.4 L | 4,800 ₹1.3 L |
| 4.00 | Providing & laying C.C. (A-20, M-20) (1:1.5:3) i/c all cost of material,labour and T&P etc complete. | 38.33 | CUM | 5,300 ₹2.0 L | 6,200 ₹2.4 L | 6,203 ₹2.4 L | 5,400 ₹2.1 L |
| 5.00 | Providing & laying R.C.C. (A-20, M-25) (1:1:2) i/c all cost of material, labour and T&P etc complete . | 28.08 | CUM | 6,800 ₹1.9 L | 6,500 ₹1.8 L | 8,000 ₹2.2 L | 7,000 ₹2.0 L |
| 6.00 | Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour and T&P etc. complete . | 0.27 | M.T. | 71,000 ₹19,170 | 60,000 ₹16,200 | 7,000 ₹1,890 | 65,000 ₹17,550 |
| 7.00 | 1st class (M-150) brick work with 1:4 cement mortar with cost of all material, labour and T&P etc complete . | 9.75 | CUM | 4,800 ₹46,800 | 3,800 ₹37,050 | 5,400 ₹52,650 | 4,900 ₹47,775 |
| 8.00 | Providing Cement plaster on brick masonary in 1:3 Cement Mortar i/c all cost of material, labour and T&P etc. complete . | 48.6 | SQM | 140 ₹6,804 | 130 ₹6,318 | 180 ₹8,748 | 150 ₹7,290 |
| 9.00 | Painting letters including cost of material for writing chainage on VRB i/c all cost of material, labour and T&P etc. complete . | 5 | NOS | 300 ₹1,500 | 100 ₹500 | 390 ₹1,950 | 300 ₹1,500 |
| 10.00 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials labour t&p etc. | 713 | SQM | 80 ₹57,040 | 80 ₹57,040 | 98 ₹69,874 | 79 ₹56,327 |
Tender Value
₹8.4 L
EMD Value
₹16,740
Closing Date
27 Sept 2025, 5:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-02/EE/2025-26 Repair and painting work of damaged bridges located at Km 47.749, 51,875, 54.179, 55.321 and 58.236 of Anupshahar Branch Canal. Lot No-06
2025_UPIDC_1075611_6
TN-02/EE/2025-26
Open Tender
Civil Works
30 days
As Per Tender Document
As Per Tender Document
3 documents required · 3 mandatory
₹944
₹16,740
EE ABDGC MEERUT NEAR MAWANA BUS STAND MEERUT
18 Dec 2025
20 Sept 2025
29 Sept 2025
20 Sept 2025
27 Sept 2025
20 Sept 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid