Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5.6 L
Closing Date
21 Jul 2026, 4:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
15 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:
The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.[Ref:- GCC April 2022 Para 10.1 of Tender Form (Second Sheet) of Annexure I of ITT. Further 'Explanation for Para 10 of the Tender Form (Second Sheet) including Para 10.1 to 10.5 - Eligibility Criteria' shall be as per GCC April 2022].
Defination of Similar Work :- Any work involving outdoor or Indoor signalling work. Signalling work-All works which are directly related to the interlocking of the core Signaling System. OR Any MACLS work involving outdoor & indoor work or alteration in existing Indoor/outdoor signaling system. OR Any work involving outdoor/indoor signalling works including MACLS/EI/PI/RRI/IBS/IBH/LC Gate/DAC/ELD and ELD for Signalling Cable, Quad Cable, Fuse Auto Changeover system etc.
48 conditions · 1 needing a document upload
The bidder has to submit the Annexures attached with tender:- I/A,I/B,II, III,IV/A,IV/B , tender first Sheet duly fill-up and signed (As applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mode of Payment from Railway through a "Letter of Credit(LC)" arrangement. If yes, attach beneficiary Bank details. Details available in Special condition.
The Balance Sheet and all other Financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN failing which the offer shall be considered as incomplete and will be summarily rejected without any further reference.
(Special Condition of Contract for mandatory updating of Labour data on Railway's shramikkalyan portal by Contractor (Ref:- Railway Board letter no.-2018/CE-I/CT/4, Dated 17.10.2018.)
A. Contractor is to abide by the provisions of Payment of Wages act &Minimum Wages act in terms ofclause 54 and 55 of Indian Railway GeneralCondition of Contract. In order to ensure the same, anapplication has beendeveloped and hosted on websitewww.shramikkalyan.indianraihwars.gov.in'.Contractor shall register his firm/company etc. and uploadrequisite details oflabour and their payment in this portal. These details shall be available inpublicdomain. The Registration' updation of Portal shall be done as under:(a) Contractor shall apply for onetime registration of his company/firm etc. inthe Shramikkalyan portal with requisite details subsequent toissue of Letter ofacceptance. Engineer shall approve the contractor's registration within 7 daysof receiptof such request. (b)Contractor once approved by any Engineer, cancreate password with login ID (PANNo.) for subsequent use of portal for allLOAs issued in his favour. (c) The contractor once registered onthe portal,shall provide details of his Letter of Acceptances (LOA)/Contract Agreementson shranikkalyanportal within 15 days of issue of any LOA For approval ofconcerned engineer. Engineer shall update (ifrequired) and approve thedetails of LOA filled by contractor within 7 days of receipt of such request.(d)After approval of LOA by Engineer, contractor shall fill the salient details ofcontract laboures engagedin the contract and ensure updating of each wagepayment to them on shramikkalyan portal on monthlybasis. (e) It shall bemandatory upon the contractor to ensure correct and promt uploading of allsalientdetails of engaged contractual labour & payment made thereof aftereach wage period. B. Whileprocessing payment of any 'ON account bill' or'Final bill' or relese of 'Advance ' or 'PerformanceGuarantee/Security deposit' contractor shall submit a certificate to the Engineer orEngineer'srepresentative that " I have uploaded the correct details of contract laboursengaged inconnection with this contract and payment made to them during the wage period in Railway'sShramikkalan portal at www.shramikkalyan.indianrailways.gov.in till _____, month,______ Year.".
Special Conditions for inclusion of 'Letter of Credit' as Mode of Payment in works Tender or Service tender. (Authority: - Railway Bd. letter no.2018/CE-I/CT/9, dated: 04.06.2018).
For all the tenders having advertised cost of Rs.10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement.
This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.
The option so exercised, shall be an integral part of the bidder's offer.
The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.
In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:
The LC shall be a sight LC.
The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.
SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15% per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills.
The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.
The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor.
The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation (format enclosed as Annexure 2) after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.
The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.
The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.
On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch).
The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.
3.5.11 The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch).
The contractor's bank (advising bank) shall submit the documents to the Railway's Bank (Local 3.5.12 SBI Branch).
The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally 3.5.13 signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.
Any number of bills can be dealt within one L.C, provided the sum total of payments to contractor is within the amount for which LC has been opened.
The LC shall be closed after the release of final payment including PVC amount, if any, to the 3.5.15 contractor.
The release of performance guarantee or security deposit shall be dealt directly by railway with the contractor i.e., not through LC.
Payment Terms:
For Purely Supply Items:-90% of the value of each Supply Item of Schedule of Works will be Paid after supply of Items and on production of the following documents: - (i) Receipt of Material at Consignee's depot. (ii) Original inspection certificate / waiver of inspection issued by Inspecting Officer.(iii)Manufacturers' inspection certificate that the materials are in accordance with the specifications of the contract. Invoice in duplicate. A certificate that the materials supplied are as per the contract and the amount claimed in the invoice is correct as per terms of the contract. (vi) (a) Store receipt certificate issued by Railway official/Representative as per format as Annexure - R of existing Tender document(Copy enclosed). 5% percent payment for purely Supply Items against tender schedule of works will be made after successful commissioning of the Station. (b) The balance 5% percent payment for purely Supply Items against tender schedule of works will be made after Completion of Work, with Final Bill of the Contract.
For Purely Execution/Installation items: - 90% of the value of each Purely Installation Item of Schedule of Works will be paid after Installation & Testing of the Item. (a)5% percent payment for Purely Execution /Installation items against tender schedule of works will be made after successful commissioning of the station. (b)The balance 5% percent payment for purely Execution /Installation Items against tender schedule of works will be made after successful commissioning of the Station. Note: In case commissioning of station is delayed by more than 06 months on Railway Account and the physical work has been completed by the contractor in totality then 5% payment on account of commissioning of the station shall be released to the contractor.
For Supply & Installation items: - 90% percent payment for Supply &installation Items against tender schedule of works will be made after successful installation & testing and on production of the documents mentioned above in Para 1. on account bill shall be paid only on production of certificate by the site Engineer that relevant portion of installation has been completed. (a) 5% percent payment for Supply &Installation Items against tender schedule of works will be made after successful commissioning of the Station. (b)The balance 5%percent payment for supply & installation items against tender schedule of works will be made after completion of work with final bill of the contract.
All payments shall be made on the certificate of the Engineer within a reasonable time of the submission of the necessary bills by the contractor. Payment shall be made through cheques/NEFT/RTGS/LC payment in the name of the Contractor.
Scope of Work(i) S&T Work:Replacement of defective signalling cables in various sections of the Samastipur Division. (ii) Proposed Site/Location for Execution of Work:The work shall be executed in different sections/stations of the Samastipur (SPJ) Division, under the jurisdiction (Section/Stations) of the respective Sectional SSE/Signal (In-Charge): SPJ, SHC, DBG, SMI, BMKI, NKE, and MFP, covering the entire division, as per Railway requirements. Note:Railway reserves the right to change, alter, add, or delete any site/location based on operational requirements, feasibility, availability of site, site conditions, or any other reason deemed necessary. (iii) The latest specifications and amendments thereto shall apply to all drawings and specifications. (iv) Technical Specifications, Inspection, Terms and Conditions: The detailed technical specifications, inspection requirements, term, and conditions for execution and supply shall be as per the tender document and applicable technical specifications (as applicable). Inspection for each item are specified in the schedule. However, for any safety item requiring Third-Party Inspection (TPI) by RDSO/RITES, shall be supplied with such TPI inspection, irrespective of the inspection agency mentioned in the schedule. (Inspection-Consignee, subject to total item value <05 Lakh, Non safety critical items). TPI (RITES) inspection charge to be borne by contractor. Note: All the materials (schedule items) shall be supplied as per railway requirement. There should be no any compatibility/suitability issues for supplied materials to the existing/New equipment. (v) The work shall be executed and materials supplied as per the instructions of the site engineer. (vi) The quantities/items indicated in the schedule may vary according to Railway or site requirements. Railway reserves the right to change, alter, add, or delete any item or quantity at any stage of the contract. Railway does not guarantee execution of work under every item or the quantities specified in the schedule. (vii)The rates quoted by the tenderer shall include the cost of materials and all incidental charges, including transportation, loading, unloading, handling, and any other associated expenses. The quoted rates shall also include all applicable taxes (including GST), duties, royalties, levies, octroi, and other statutory charges (as applicable). (viii) Recovery of taxes from bills shall be made as per the extant rules in force. (ix) The contractor shall be responsible for the carriage, safe transportation, loading, unloading, storage, protection, and safe handling of all materials required for the execution of the work. (x) All relevant standard guidelines and instructions issued by Railway Board,HQ/East Central Railway regarding contract management, technical aspects/requirements,execution of work, and prevailing Railway practices, E. C. railway practice inforce etc. shall be apply in this contract (as applicable).
Transportation of Materials:-
All materials specifically supplied by contractor to be supplied to the SSE/Signal or Tele/Store/SPJ or as specified by competent authority.
Contractor will carry all the materials (contractor supplied) from SSE/Signal or Tele/Store/SPJ or as specified by Competent authority to the site of work at his own cost and arrangement.
Execution of AMC:- Not applicable.
Replacement of defective Signaling Cable of Various sections of Samastipur division.
SPJ-SnT-S-04-2026
SPJ-SnT-S-04-2026
Open
Works - General
12 Months
Samastipur, Bihar
₹0
₹5.6 L
21 Jul 2026
30 Jun 2026
7 Jul 2026
124 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,29,81,607.35 | ||
| — | 100.00 | — | — | ||
| Laying cables of different sizes as per cable route plan approved by Railway and meggering of all main & tail cables as per technical specification of tender. ii)2 core to 12 core signalling cable. | — | — | — | 11,75,692 | |
| — | 60.00 | — | — | ||
| Excavation of Trench in all kinds of soil and refilling of trenches (1.2 Mtr, Depth, 300 mm Width) - without bricks. Note:- (I) Payment will be made as per actual work done on pro rata basis, if required depth is not available at site. (II) If the depth of trench is not uniform in a span of 100 mtr.or shorter length, if site condition demands along the cable run minimum depth will be taken for that particular stretch for payment. | — | — | — | 87,82,200 | |
| — | 1500.00 | — | — | ||
| Installation of Double Wall Corrugated (DWC) pipe with socket coupler. This includes trenching 1.2 mtr. Depth and back filling. | — | — | — | 1,63,770 | |
| — | 500.00 | — | — | ||
| Supply of G.I. Pipe with threaded collars of 100 mm nominal bore specn. No. IS 1239 medium grade. Perforated of required length on bridge / below metaled road/ L-xing /Culvert as per technical specification of tender. A) Supply portion for the G. I. Pipe & collars. (Insp.-RITES). | — | — | — | 6,20,865 | |
| — | 500.00 | — | — | ||
| Fixing of G.I. Pipe with threaded collars of 100 mm nominal bore specn. No. IS 1239 medium grade. Perforated of required length on bridge / below metaled road/ L-xing /Culvert as per technical specification of tender. B) Execution with remaining miscellaneous materials. | — | — | — | 46,860 | |
| — | 1000.00 | — | — | ||
| Supply of galvanized iron trucking with cover of same materials as per DRG. No. SGW/MGS/C7/91 and fixing on girder bridges including supply of channel, angle iron, bracket units, nuts and bolts of proper size & fitting of support at an interval of 1mtr including laying of cables inside the trough & filling with bitumen compound as per spec. no. IRS:TC-25/76 after cable is laid. Bitumen compound and other materials as required for the work shall be supplied by the contractor. a) Supply portion . (Insp.- RITES). | — | — | — | 21,89,220 | |
| — | 1000.00 | — | — | ||
| Fixing of galvanized iron trucking with cover of same materials as per DRG. No. SGW/MGS/C7/91 and fixing on girder bridges including supply of channel, angle iron, bracket units, nuts and bolts of proper size & fitting of support at an interval of 1mtr including laying of cables inside the trough & filling with bitumen compound as per spec. no. IRS:TC-25/76 after cable is laid. Bitumen compound and other materials as required for the work shall be supplied by the contractor b)Execution Portion. | — | — | — | 8,10,820 | |
| — | 500.00 | — | — | ||
| Reinstatement of platform and repairing to original state after cable laying work. | — | — | — | 1,99,810 | |
| — | 25.00 | — | — | ||
| Casting, Concreting and Curing of foundation and erection for full apparatus case(GKP- type) as per DRG No. SGW/MGS/L1/91 including cost of all materials required for fixing holding down bolts, casting, concreting and fixing of "E" type lock. Note :i) The contractor will provide holding down bolts, ii) Bottom of apparatus cases should be filled with sand and the top surface covered with masonry work and neat cementing. | — | — | — | 1,78,281.75 | |
| — | 25.00 | — | — | ||
| Fixing, wiring of terminal strips, Bakelite strip, transformers, relays fuses with base and supply and fixing of shelves for full apparatus case with termination earthing of cable and wiring with lettering as required including supply of wires and miscellaneous materials, sand filling and plastering over sand filling per location.(All materials except transformers, relay, terminal strips, Bakelite strip and fuses with base to be supplied by the contractor.) | — | — | — | 1,12,331.5 | |
| — | 15.00 | — | — | ||
| Casting, Concreting and Curing of foundation and erection for Half apparatus case (GKP- type) as per DRG No. SGW/MGS/L1/91 including cost of all materials required for fixing holding down bolts, casting, concreting and fixing of ""E"" type lock. Note: i) The contractor will provide holding down bolts, ii) Bottom of apparatus cases should be filled with sand and the top surface covered with masonry work and neat cementing. | — | — | — | 96,291.3 | |
| — | 15.00 | — | — | ||
| Fixing, wiring of terminal strips, Bakelite strip, transformers, relays fuses with base and supply and fixing of shelves for Half apparatus case with termination earthing of cable and wiring with lettering as required including supply of wires and miscellaneous materials, sand filling and plastering over sand filling per location.(All materials except transformers, relay, terminal strips, Bakelite strip and fuses with base to be supplied by the contractor.) | — | — | — | 37,466.55 | |
| — | 25.00 | — | — | ||
| Supply of full size location box as per design of GKP signal workshop. (Insp.-RITES). | — | — | — | 6,78,116.75 | |
| — | 15.00 | — | — | ||
| Supply of Half size location box as per design of GKP signal workshop. (Insp.-Consignee). | — | — | — | 3,20,105.7 | |
| — | 80.00 | — | — | ||
| Supply of E-type lock without key,spec.no.IRS-S-30, Drg.no.S-3376/M key -S-3377/M. Individual number of miniature E locks and Normal size of locks required at site to be decided by the site engineer as per site requirement. (Insp.-RDSO). | — | — | — | 1,31,999.2 | |
| — | 80.00 | — | — | ||
| Key for E type lock supplied above. (Insp.-Consignee). | — | — | — | 19,820.8 | |
| — | 50.00 | — | — | ||
| Filling earth around location box/signal post for a width of 0.5 m on all sides, upto a level of 150 mm below the foundation top. This work includes consolidation of earth by watering (Unit CUM means per CUM)watering. | — | — | — | 11,247.5 | |
| — | 80.00 | — | — | ||
| Supply of Bakelite Strip/Sheet of size (950 x 75 x 12) mm. For fixing 30 nos. ARA terminals/Fuse base terminals/Fuse base. (Insp.-Consignee). | — | — | — | 51,151.2 | |
| — | 80.00 | — | — | ||
| Supply of slotted angle (40x40 x 2 mm). (Insp.-Consignee). | — | — | — | 23,789.6 | |
| — | 10.00 | — | — | ||
| Supply of paper base hylumsheet 12 mm thick. (Insp.-Consignee). | — | — | — | 84,122.7 | |
| — | 250.00 | — | — | ||
| Supply of PBT ARA terminal as per IRS SPECN No. IRS:S- 75-91. i)6 way. (Insp.-RDSO). | — | — | — | 1,52,117.5 | |
| — | 100.00 | — | — | ||
| Supply of PBT ARA terminal as per IRS SPECN No. IRS:S- 75-91 ii) 1 way.(Insp.-RDSO). | — | — | — | 11,273 | |
| — | 10.00 | — | — | ||
| Supply of basic material to construct unit Maintenance Free Earth for Single Earth consisting as per Spec. Nos. RDSO/SPN/197/2016 Ver 1.0 or latest, bonding connections drawing Nos. SDO/ RDSO/E&B/002 or latest are as under,(a) Copper bonded steel electrodes of 3.0 m long, 17.0 mm diameter with copper bonding thickness of min 250 micron and UL listed and marked -1 Nos. (b) Earth Enhancement compound supplied in sealed bags of min 30-35 Kg.- 1 Nos. (c ) Copper Strip of 200mm x 25mm x6mm to exothermically welded to Earth electrode- 1 Nos.(d)Copper Strip of 300mm x 25mm x 6mm (MEEB) - 1 Nos.(e) Copper Strip of 150mm x 25mm x 6mm (SEEB)- 1 Nos. It also includes supply of (i) 35 Sq. mm Multi-strand Single Core PVC insulated Copper Connector as per IS:694 for connecting Main Earth Electrode to MEEB in the equipment room in duplicate.-10 meter (ii) 16 Sq. mm Multi-strand Single Core PVC insulated Copper Connector as per IS:694 for connecting MEEB to SEEB and SPDs to MEEB.-10 meter (iii) 10 Sq. mm Multi-strand Single Core PVC insulated Copper Connector as per IS:694 for connecting various equipment to SEEB- 10 meter. (Insp.-RDSO). | — | — | — | 2,08,820 | |
| — | 10.00 | — | — | ||
| Installation of Single Maintenance Free Earth pit as per RDSO Drawing Nos. SDO / RDSO/ E&B/001 which includes the following, a) Digging/Auguring/Boring of single earth pit of 100mm to 125mm dia. to the depth of approx. 3 meter. b) Insertion o f 3.0 meter electrode and penetrating it minimum 150 m m b y pushing gently with sledge hammer where the natural soil is assumed. (c) Filling of earth pit w ith Earth Enhancement Compound (EEC) in slurry form a n d backfilling. ( d ) Carrying out exothermic weld connection on single earth electrode t o a copper tape o f 200 x 2 5 x 6 mm. (e) Carrying out exothermic weld connection on the copper tape of 200 x 25 x 6 mm on Earth Electrode for connecting two 35 Sq. mm cables for redundancy. (f) The exothermic welding material for bonding the earth system shall be procured from RDSO approved firms, which includes graphite modules, clamps, weld metal powders etc. (g) The dimension of the chamber will be of 300 x 300 x 300 mm (inside dimension) of RCC with 50mm thick and fine finish, Inspection chamber should be as per IEC 62561-5 or latest. The top RCC cover size shall be 400 mm X 400 mm X 50mm. The date of testing and earth resistance value shall be written on the cover with black base with yellow paint or as per instruction of site engineer. | — | — | — | 65,870 | |
| — | 25.00 | — | — | ||
| Supply and transportation of Earth Electrode as per Drg.Nos.RE/33/P/7021 (MOD.''F'') or latest. (Insp.-Consignee). | — | — | — | 1,30,550 | |
| — | 70.00 | — | — | ||
| Supply and transportation of Earth Leads 50mmx6mm mild steel for earthing as per Drg. Nos. RE/33/P/7021 (MOD. ''F'') or latest. (Insp.-Consignee). | — | — | — | 12,530 | |
| — | 25.00 | — | — | ||
| Excavation of earth pit, placing & fixing of Earth electrode with construction of cement enclosure to SEM Drawing Nos. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway. | — | — | — | 38,500 | |
| — | 2500.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of stores materials, preparation of site and boring of 110mm dia or above to suit site requirement and placing HDPE pipe of size 63 to 50 mm in single / double /triple etc required for crossing/laying of RailwayS&T cables in a combination of quad & signalling cables etc. as per required comprising upto 72 cores in any HDD section on land/bridges / culverts / track /pucca road crossing and blowing pulling of Quad /S&T cables within HDPE pipe. Boring of trench shall be minimum 3 (three) meter or more below the river bed, 01 (one) Mtr below or more the track and 1.5 (one point five) meter below or more other lands including road /pucca road crossing area. This includes supply of permanently lubricated HDPE pipe of size 63 to 40 mm dia& its accessories suitable for HDT as per Specification No.RDSO/SPN/TC/45/2013 Rev.2.0 with Amdt. 3 or latest amendment & cost of the fuel and all other items which will be required for laying of cable through it. Inspection : RITES for HDPE pipe NOTE: The number of HDPE pipes (of any dia as mentioned above) to be pulled in any HDD section will depend upon the numbers of S&T cables to be pulled through that HDD section as per site requirement. At a particular site, the second / additional HDD is to be done only after completing the pullingof 72 cores of cable through 1st HDD other wise the second / additional HDD will not be counted as a new/additional HDD for the purpose of billing. Only S&T cables to be supplied by Railway. Printed Cable sketch plan showing dirversion& depth, which shall be generated by machine to be submitted by firm just after every boring & to be submitted while billing. (Insp.-RITES). | — | — | — | 43,29,950 | |
| — | 1000.00 | — | — | ||
| Excavation of trench less trench/manual boarding paring size upto 110 mm) up to a depth of minimum 1.0 meter along with laying of HDPE/DWC pipe and its accessories, all other items which will be required for laying of cable through HDPE/DWC Pipe (Track/Road Crossing) as per requirement at site. (Insp.-Consignee). | — | — | — | 9,00,770 | |
| — | 25.00 | — | — | ||
| Concreting on Railway cables/S&T gears in ratio of 1:2:4 using cement of good quality, sand, stone chips of size 12 mm to be used for concreting purpose along with related missionary work. All materials required for execution of the work will be supplied by the firm as per site engineer. This includes water curing of concreted portion for minimum 3 days. Note: Suitable arrangement for continuous water curing to be ensured. Associated work of digging etc. to be done by contractor. | — | — | — | 1,19,549.5 | |
| — | 5000.00 | — | — | ||
| Termination of cable cores on ARA terminals or on 8 way terminals in the cable termination rack. | — | — | — | 94,900 | |
| — | 15.00 | — | — | ||
| Loading & unloading of heavy S&T materials in 15 MT Truck (from store to site). (Unit-Each stands for per trip). | — | — | — | 1,58,044.2 | |
| — | 3000.00 | — | — | ||
| Transportation of materials 15 MT capacity truck to site. | — | — | — | 3,55,230 | |
| — | 1000.00 | — | — | ||
| Supply of Disconnect type Terminal, screwless, 2 IN 2 OUT (as per spec. no. RDSO/SPN/189/2004 or latest) along with all accessories including separators for fixing on Cable Termination Rack/Location boxes for Cable Termination Purpose. (Insp.-RDSO). | — | — | — | 1,04,750 | |
| — | 1000.00 | — | — | ||
| Fixing installation of disconnect terminal (Wago or Similar) on relay rack/ctr/location with steel carrier rail. | — | — | — | 1,520 | |
| — | 100.00 | — | — | ||
| Supply of Non deteriorating type low voltage cartridge fuse as per Spec. No. IRS/S/78/92. Round head type. (a) 2 Amp. Capacity. (Insp.-RDSO). | — | — | — | 4,622 | |
| — | 100.00 | — | — | ||
| Supply of Non deteriorating type low voltage cartridge fuse as per Spec. No. IRS/S/78/92. Round head type. (b) 6 Amp. Capacity. (Insp.-RDSO). | — | — | — | 12,129 | |
| — | 100.00 | — | — | ||
| Supply of Non deteriorating type low voltage cartridge fuse as per Spec. No. IRS/S/78/92. Round head type. (c) 16 Amp. Capacity. (Insp.-RDSO). | — | — | — | 11,313 | |
| — | 100.00 | — | — | ||
| Supply of PBT fuse block with inserts cartridge type, to be mounted inside the location Box/ Relay Rack. Fuse Base (DRG No. SA - 23748, IRS: S-75/91).(Insp.-RDSO). | — | — | — | 26,211 | |
| — | 100.00 | — | — | ||
| Supply of PBT fuse block with inserts cartridge type, to be mounted inside the location Box/ Relay Rack. Fuses (2A, IRS : S-78/92).(Insp.-RDSO). | — | — | — | 16,275 | |
| — | 25.00 | — | — | ||
| Supply of Thermo-shrink jointing (TSF) kits for jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/condenser/Y- (Derivation)/Loading Coil/Transformer Joints as per Specification Nos. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest.(Insp.-RDSO). | — | — | — | 81,500 | |
| — | 25.00 | — | — | ||
| Execution of Straight joint on Quad cable/ jelly filled Telecom cable using Thermo-shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost.Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released. | — | — | — | 37,450 | |
| — | 25.00 | — | — | ||
| Supply of VF Transformer (1120:470/ 1120:1120/ 470:470/470:600/ 1200:600 Ohm) as per Specification Nos. IRS- TC-76/2021 Ver 1.0 or latest (Cylindrical type) or IRS/TC/22/ 2021 Ver 1.1 or latest (Rectangular type).(Insp.-Consignee). | — | — | — | 24,425 | |
| — | 10.00 | — | — | ||
| Supply of 24 Fiber OFC Joint Closure as per Specification Nos. RDSO/SPN/TC/68/ 2014 Rev 1.0 or latest complete with all accessories including sealing with mechanical clamp facility. (Insp.-Consignee). | — | — | — | 41,130 | |
| — | 240.00 | — | — | ||
| Splicing of Optical Fiber Core and routing in joint closure/FDMS as per instruction of site Engineer. | — | — | — | 36,480 | |
| — | 10.00 | — | — | ||
| — | 100.00 | — | — | ||
| Painting of two coats of enamel paints lover one coat of red oxide primer and there after numbering on the following items after scraping and cleaning of the surface where ever necessary. Primer and paints both Asian paint make are to be supplied by the contractor. Numbering is to be as per practice of the ECR and directives of the site Engineer. (i) Location boxes inside and outsided surfaces with Aluminum paint. (a) Single case. | — | — | — | 92,435 | |
| — | 25.00 | — | — | ||
| Painting of two coats of enamel paint over one coat of red oxide primer and there after numbering on the following items after scraping and cleaning of the surface where ever necessary. Primer and paints both Asian paint make are to be supplied by the contractor. Numbering is to be as per practice of the ECR and directives of the site Engineer. (i) Location boxes inside and outsided surfaces with Aluminum paint. (b) Half case. | — | — | — | 18,564.5 | |
| — | 15.00 | — | — | ||
| Dismantling & Releasing of following S&T gears. The work includes transportation of the released material to the store of respective Consignee's store (will be mention in Tender documents.) and properly stacking the same in the store. The rate shall cover the cost of tools and plants, ladders, scaffoldings, all other adjuncts required for the works. c) Location box /Junction box which includes releasing of terminal board, relays, terminals, batteries and chargers. | — | — | — | 14,877.45 | |
| — | 15.00 | — | — | ||
| "Shifting of location boxes with manual labour, JCB or poclain machine by exposing the cable gently without any damage to location box and inside signalling gear. " | — | — | — | 71,689.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderNotice.pdf
ATTACHMENT
Tender1stsheet.pdf
ATTACHMENT
Annexures.pdf
ATTACHMENT
GCC2022WithACS_upto10th.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .