Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.0 LAccepted-AOC 1 133 MAIN ROAD SIRUNALLUR POST ALATHUR TALUK PERAMBALUR DISTRICT 621118 | ALATHUR | PERAMBALUR | TAMIL NADU | 621118 | L1 | Accepted-AOC work order | |
| 2 | L2₹54.0 L+₹2.0 L (3.82%)Rejected-Finance H 99 6TH CROSS STREET R M COLONY DINDIGUL | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/S.SIGRUN VERTRAG PROJECTS L2 | SENTHILKUMAR L1 |
|---|---|---|---|---|---|
| 1.001 Name of the Work :Improvements to the road from Malayagoundpatty to NH 7 Road in Malayagoundpatty Panchayat Km 0/0 - 1/375 ( R.Code 224 ) Estimate Amount: 50.16 lakhs | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete. | 836.5 | Sqm | 6 ₹5,019 | 4 ₹3,346 Lowest |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 941.06 | Cum | 150 ₹1,41,159 | 130 ₹1,22,337.8 Lowest |
| 4.00 | Picking the existing BT surface up to 50mm depth including removing the stuff away from the site etc.complete | 1,452.25 | Sqm | 25 ₹36,306.25 | 21 ₹30,497.25 Lowest |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 261.4 | Cum | 350 ₹91,490 | 335 ₹87,569 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 655.95 | Cum | 2,200 ₹14,43,090 | 2,152 ₹14,11,604.4 Lowest |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,373 | Sqm | 87 ₹3,80,451 | 82 ₹3,58,586 Lowest |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 4,373 | Sqm | 21 ₹91,833 | 19 ₹83,087 Lowest |
| 9.00 | BC 25/30/40mm Thick (Grade II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 | 109.32 | Cum | 12,000 ₹13,11,840 | 11,459 ₹12,52,697.88 Lowest |
| 10.00 | Suppy of Kilometre Stone of size 1.65m x0.45 x0.15m including all charges etc, | 1 | nos | 2,750 ₹2,750 | 2,730 ₹2,730 Lowest |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
25 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
NABARD RIDF XXXI - 2025-26 Nilakottai Block of 1 no of road Package No.TN05-07 of Dindigul District
2025_RDTN_571079_1
DPIR.No.2866-2025- DATE 06.06.2025
Open Tender
Civil Works
Item Wise
180 days
DRDA
NABARD RIDF XXXI - 2025-26 Nilakottai Block of 1 no of road Package No.TN05-07 of Dindigul District
3 documents required · 3 mandatory
₹0
₹56,000
DRDA,DINDIGUL
12 Aug 2025
19 Jun 2025
25 Jun 2025
19 Jun 2025
25 Jun 2025
19 Jun 2025
20 Jun 2025
Amount
1 Name of the Work :Improvements to the road from Malayagoundpatty to NH 7 Road in Malayagoundpatty Panchayat Km 0/0 - 1/375 ( R.Code 224 ) Estimate Amount: 50.16 lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Picking the existing BT surface up to 50mm depth including removing the stuff away from the site etc.complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BC 25/30/40mm Thick (Grade II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Suppy of Kilometre Stone of size 1.65m x0.45 x0.15m including all charges etc,
Suppy of Hectametre Stone of size 0.90 x 0.15cx 0.15 m including all charges etc,
60 cm Equilateral triangle cautionary signboard
Construction of Retaininig wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenance I year
Maintenance II year
Maintenance III year
Maintenance IV year
Maintenance V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/S.SIGRUN VERTRAG PROJECTS (BID ID -1380783)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .