Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹70.7 L
EMD Value
₹84,000
Closing Date
10 Nov 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director
The Project Director DRDA VELLORE
vellore District TNRRIS 2020-21 under 80 percent cgf Grant Strengthening of 3 Roads in Konasamuthiram Agaravaram ulipanchayat atGudiyatam Block Package No.07
2020_RDTN_181421_1
A9/2183/2020
Open Tender
Civil Works - Roads
Works
180 days
DRDA, VELLOR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹84,000
21 Nov 2020
26 Sept 2020
10 Nov 2020
26 Sept 2020
10 Nov 2020
26 Sept 2020
90 days
Amount
Strengthening of Road from Jeeva Nagar to Sakthi Nagar in Kondasamuthiram panchayat Km 0/0 - 1/400 (Road code- R272)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-1/400)
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method)
Providing and laying, Spreading and compacting graded stone aggregates to Wet Mix Macadam 125mm thick Specification including Premixing the materials wih water at OMC in mechanical mix plant carriage of mixed material by tipper to site layint in unifom layers with pavers in Sub Base / Base course on well prepared surface and compacting with vibratory roller to achive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over CRM / Gravel base using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for Preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Emulsion Bitumen (RS1) per 10 sqm for Preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Provision for HM stone
Provision for kM stone
Providing Name board charges
Strengthening of road from Poongulam to Erikollai Road in Agaravaram Panchayat Km 0/0 -1/5 (R 342)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-1/400)
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete
Providing and Laying Advance BT Patches using 45mm IRC metal with 44kgs of bitumen for 1 cum including cost & conveyance of all materials and labour charges etc complete
Providing and Laying Advance BT Patches using 13.2mm IRC metal with 44kgs of bitumen for 1 cum including cost & conveyance of all materials and labour charges etc complete
Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Provision for HM stone
Provision for kM stone
Providing Name board charges
Strengthening of road from C.G.Road to Koppampatti via Indira Nagar AD colony Pattuvampatti Road in Ulli Panchayat Km 0/0 -1/6 (R 183)
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-1/6)
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete
Applying tackcoat over BT Surface using 4kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Construction of 3.0m RCC Slab Culvert @CH 1090
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
First footing
slab centring
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire,etc.,complete
RCC 1:1.5:3 Mix using 20mm ISS Sine HBG metal including cost and conveyace of all material and all labour charges,etc.,
Basement of the abutment filled with gritty including cost and conveyance of all etc.. Completed
Construction of retaining wall@CH 1065m
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Provision for weap holes
Provision for HM stone
Provision for kM stone
Provision for Signboard
Providing Name board charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHANDRAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .