Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance VILLAGE BHADORA POST ROHITA DISTT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | -0.10% | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹1.9 L (0.60%)Admitted-Finance VILL P O TIKOLA KALAN ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | +0.50% | ₹3.1 Cr+₹1.9 L (0.60%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹8.1 L (2.60%)Admitted-Finance | +2.50% | ₹3.2 Cr+₹8.1 L (2.60%) | L3 | Admitted-Finance |
Tender Value
₹3.1 Cr
EMD Value
₹17.5 L
Closing Date
19 Jan 2026, 10:00 amClosed
Deputy Cane Commissioner Meerut
Ganna Bhawan Meerut
Construction Of 5000 M.T. Sugar Godown With Approch Road, Boundary Wall, Brick Soling and Drain in Campus of the Kisan Sahakari Chinni Mills Ltd-Anoopshahr Distt-Bulandshahr (Uttar Pradesh)
2026_CDSI_1104241_1
3117/C/Nirman/2025, Dt.05-01-2026
Open Tender
Miscellaneous Works
Percentage
365 days
Meerut
Tender Fee, EMD and documents as per Tender Document/NIT
2 documents required · 2 mandatory
₹9,180
Deputy Cane Commissioner Meerut
₹17.5 L
19 Feb 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
Earth Work
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not execeeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottom, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport up to a lead of 5km also including ramming and watering of earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.
Extra for every additiona lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials..All kinds of soil
Supplying and filling in plinth with Sand under floors, including watering, ramming, consolidating and dressing complete.
clearing jungle including uprooting of rank vegetation grass,bush,wood,trees and saplings of girth up to 30cm---
Supplying chemical emulsion in sealed containers including delivery as specified..Chlorpyriphos/ Lindane emulsiable concentrate of 20%
Along the external wall below concrete or masonary apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc.With Chlorpyriphos / Lindane E.C. 20% with 1% concentration
Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12mm diameter holes and plugging with cement mortar 1:2 (1 cement : 2 Coarse sand) to match the existing floor.With Chlorpyriphos / Lindane E.C. 20% with 1% concentration
Providing and laying in position cement concrete of specified grade excluding the cost 0f centering and shuttering - All work up to plinth level.1:3:6 (1 cement : 3 coarse sand (Zone-III) derived from natural source :6 graded stone aggregate 20mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost 0f centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand (Zone-III) derived from natural source :8 graded stone aggregate 20mm nominal size derived from natural sources)
Centering and shuttering including strutting, Propping etc. and removal of form work for :Foundations, footings, bases for columns
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand(xone-III) derived from natural sources:4 graded stone aggregate 12.5 mm nominal size derived from natural sources)
Extra for providing &mixing waterproofing material in cement concrete work in doses by weight of cement as per manufacturers specification per bag of 50 kg cement use
Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per squre metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.
Centering and shuttering including strutting, Propping etc. and removal of form work for :Foundations, footings, bases for columns etc. for mass concrete
Centering and shuttering including strutting, Propping etc. and removal of form work for :Lintel, beams, plinth beams, girders
Centering and shuttering including strutting, Propping etc. and removal of form work for :Columns, Pillars, Piers, Abutments, Posts and struts
Steel Rainforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.Thermo -Mechanically treated bars of grade Fe-500D or more.
providing and laying in position ready mixed or batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sourcees, Portland Pozzolana ? Ordinary Portland / Portland Slag cement, admixtures in recommended proporations as per IS : 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works up to plinth level..Concrete of M25 grade with minimum cement content of 330 kg /cum
providing and laying in position ready mixed or batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sourcees, Portland Pozzolana ? Ordinary Portland / Portland Slag cement, admixtures in recommended proporations as per IS : 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level up to floor V level.Concrete of M25 grade with minimum cement content of 330 kg /cum
Add for using extra cement in the items of design mix over and above the specified cement content therein.
Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinthCement mortar 1:4 ( 1cement : 4 coarse sand)
Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes inCement mortar 1:4 ( 1cement : 4 coarse sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing 1mm thk MS sheet door with frame 40x40x6 mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flats 30x6 mm for diagonal braces and central cross piece
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked togather through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454-part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover.
Providing and fixing ball bearing for rolling shutters.
Providing and fixing bolts including nuts and washers complete.
Extra for providing mechanical device chain and crank operation for operating rolling shutters.
Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T- iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer
Providing & fixing at all heights, levels and locations colour finish Aluminium alloy roofing sheets of alloy IS designation 31500, temper Hx8 conforming to IS 737 and dimensions as per IS code 2676 with characteristics of good formability and corrosion resistance. The profile sheets shall be fixed to truss members in slope or required pitch or curvature with Hex cap headed self drilling/tapping Stainless steel screws M6, 50 mm long with 3 mm EPDM seal washer etc. all inclusive of labour, scaffolding, T&P and sundries etc. complete as per directions of the Engineer-In-Charge. (Cost of truss/frame work shall be paid separately). 12.65.1 0.56 mm, Aluminium Colour coated troughed profile with center to center pitch of 200 mm, depth of 32 mm, overall profile width1092 mm, cover width 1000mm.
Providing and fixing of Pre-coated colour or mill finish Aluminium Roofing Accessories in 0.71 mm thickness ,Alloy 31500 (IS designation) [Aluminium Alloy (AA) 3004 (ISO designation)] For color, coating shall be 5-7 microns epoxy primer on both sides of the sheet and polyester top coat 15-18 microns, using self drilling/tapping SS screws of size 6 x 50mm with 3mm thick EPDM seal and SS plain washer complete : 12.66.1 Precoated/mill finish aluminium Ridges plain (500- 600mm)Ridge plain (500-600 mm)
12mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)
12 mm cement plasterc 1:3 (1 cement: 3coarse sand) finished with a floating coat of neat cement.
18mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand & anufacturer, over the plastered wall surface to prepare the surface even & smooth complete..New work (Three or more coats)
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work an under coat of suitable shade with ordinary paint of approved brand and manufacture
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40mm dia M.S. tube 1.5 m centre, horizontal & vertical tubes joining with cup & lock system with M.S. Tubes, MS tube challies, MS clamps and MS staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building atc whwreever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Demolition cement concrete manually/ by mechanical means including disposal of material with in 50 metres lead as per direction of Engineer-in-charge.Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)
Demolition RCC work manually/ by mechanical means including stacking steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer-in-charge.
Demolition brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material with in 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Providing and laying 150mm thk, neat, clean, dust and stain free in true line & level M25 grade plain/reinforced cement concrete VD floors to be laid in maximum panel size of 4 mtr. x 10 mtr. And vibrating the same with screed vibrator so as to get cement slurry on top. The top surface shall be smooth finished without adding extra cement slurry (self finish) by mechanical trowel. Vacuum dewatering to be carried out. (Only TREMIX / AQUIRIOUS system to be used). The panels shall be poured in the diagonally opposite manner. The rate shall include providing and laying panel shuttering of channels or angles, curing by flooding the water for at least 7 days, cleaning of surface to make it dust free before laying the concrete, uniform shade finished surface. The rate shall include filling of construction joints with MM-80 Semi-Rigid epoxy joint filler or MYK make filler. The rate shall also include opening of construction joints up to 30mm depth of floor and 4 mm wide and panel size will be 4x5 mtr with the help of power blade. Note:- (Minimum cement content for this item 330 Kg/cum and excess / less cement used as per design mix report.)
Providing and laying Non Shrink Grouting material like foscrock,Sika etc.
Provding laying and spreading material on a prepared sub grade, adding cement @2% by weight to the spread material manully, mixing in place with rotavator and compacting with the vibro road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.40-63 mm gauge
Supplying, Even Spreading and Applying approved make Natural Cement Colour Non Metallic floor hardener (50 Grade) compound of over the concrete floor surface, the rate is inclusive finished smooth with the mechanical power trowel.(5.0 kg per sq.mtr hardender Spreading) (Make-FOSROC /Samrock/ BASF)
Supply & laying of 250 micron HDEP Sheet including 500mm overlap joints and joints sealed with heating and brown tape.
Providing laying and fixing in position 2mm thick Translucent Roof light sheets matching to the roof sheet profile with necessary fixtures, etc. complete.
Supply & fixing of fire extinguisher, ABC Type 6.00 kg. capacity(ISI Marked IS:15683 & TAC approved) comlete with initial charge and wall bracket, along with supply of all materials and labour for proper completion of work.PWD-2018
Supply & fixing of CO2 type fire extinguisher, 6.5 kg. capacity(ISI Marked IS:2878 & TAC approved) comlete with initial charge and wall bracket, along with supply of all materials and labour for proper completion of work.PWD-2018
Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport up to a lead of 5km also including ramming and watering of earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.
Supplying and filling in plinth with Sand under floors, including watering, ramming, consolidating and dressing complete.
Brick soling with straight over burnt bricks laid on edge and dry labour only including preparation of sub-grade to prescribed camber filling joints with local earth spreading blinding coat 1 cm. 3/8" depth of 'local earth over the entire surface and including cost of material, labour and T&P etc. required for proper completion of the work. as per MORD specification 11.2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
16.43.1 Providing and laying design mix cement concrete of M-30 grade, in roads/taxi tracks/ runways, using cement content as per design mix, using coarse and and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and mpacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineerin-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately).Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. 16.43.1 Cement concrete prepared with batch mixing machine cum
Construction of Drain (As per details attached) 230.00 mtr
Construction of Boundary Wall (As per details attached) 230.00 mtr
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Tendernotice_2.pdf
PDF • 7.01 MB
BOQ_2036997.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .