| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | -27.77% | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 CrAdmitted-Finance | -23.65% | ₹2.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.2 CrAdmitted-Finance | -0.55% | ₹3.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.2 CrAdmitted-Finance | -0.33% | ₹3.2 Cr | L4 | Admitted-Finance |
Tender Value
₹3.7 Cr
EMD Value
₹7.5 L
Closing Date
10 Mar 2026, 4:00 pmClosed
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Construction of lanes, drains, Retaining walls, Trash guards etc. Vis a vis Repairment of Existing lanes/drains within limits of Municipal Council Pulwama.
2026_PWDJK_302904_1
144/EEP/ RnB/2025-26/11210-20 dt.11.02.2026
Open Tender
Civil Works
545 days
Pulwama
as per nit /sbd
16 documents required · 16 mandatory
₹5,500
Executive Engineer RNB Division Pulwama
₹7.5 L
superintending Engineer RNB Circle Pulwama
27 Mar 2026
11 Feb 2026
11 Mar 2026
13 Feb 2026
10 Mar 2026
13 Feb 2026
15 Feb 2026
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :
Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. allcomplete as per direction of Engineer-in-charge
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand)Dark shade using ordinary cement.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form forEdges of slabs and breaks in floors and wallsAbove 20 cm wide
Centering and shuttering including strutting, propping etc. and removal of form forEdges of slabs and breaks in floors and walls under 20 cm wide
Centring and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached plasters, buttresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.incld carriage of all materials involved.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. welded
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:4:8 or leaner mix (i/c equivalent design mix)
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc.including dismembering and stacking within 50 meters lead.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth.
Providing and fixing of 6 " dia PVC Pipes of standard make including all fittings and fixtures complete.incld earthwork and refilling complete.
Supply and filling of Nallah muck of specified and required size as directed including dressing, ramming watering and compacting with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete.
Supplying and stacking of graded stone aggregate at site of size 63-45mm size (approved quarry) .
Supplying and stacking of stone screenings, chippings at site . 13.2mm nominal size (Type-A)
Supplying and stacking of moorum (stone dust) at site
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
clearance of drain by way of removal of solid garbage i/c plugging of drain by way of sand filled cement bags complete job all as per directions of eic
Providing and laying of 18" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Providing and laying of 18" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Providing and laying of 24" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Providing and laying of 12" Φ RCC spun pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Providing and fixing in position precast R.C.C. manhole cover and frame of required shape and approved quality.Circular shape 500mm internal diameter as per directions of EIC.
Providing and laying of 8" Φ MS pipes in proper level and grade including trench excavation and cushion as per clause 2900 of MORTH specification including all carriages involved complete
Carriage of different materials by MT incld loading,unloading and stacking complete.
63-45mm stone agg. for an avg. lead of 20kms
Screening/dust /stone agg./sand for an avg lead of 05 kms
Disposal of excavated earth beyond municipal committee limits. For an avg lead of 03kms
Head load of different materials I,e sand/ stone agg. For an avg. lead of 100mtrs .
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive
Removal of damaged manhole complete all as per directions of EIC to be paid as per actual whichever is less.
P/F of sign board incld taking of photographs before ,during and after completion of project.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.71 MB
Tendernotice_2.pdf
PDF • 1.76 MB
Tendernotice_3.pdf
PDF • 2.38 MB
BOQ_983072.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid