Double DT Separation of double DT from Existing Kottukarampatty SS I 100KVA to Erection of 05 Nos 25 KVA in existing 11KV Pavakkal feeder fed off from Singarapettai 110KV SS in Uthangarai-II Section of Pochampally Division under RDSS S
2022_EB_232558_1
KEDC/02/22/16.05.2022/DT Seperation Uthangarai-II
Open Tender
Electrical Works
Works
180 days
Krishnagiri
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹2,300
Yes
4 Jun 2022
17 May 2022
27 May 2022
17 May 2022
26 May 2022
17 May 2022
17 May 2022 - 26 May 2022
Amount
Excavation of Pole Pit for pole above 8.00 m length using JCB/Manual
Excavation of Stay Pit of 4.5' to 5 ' depth using JCB/Manual
Erection of RCC,REC,PSC Poles above 8.00 m length using JCB/Manual
Erection of stay set complete with fixing of stay wire, Eye, Bow, Guy Shackle, Binding etc.,
Fixing of HT Pin Insulator with Pin/Polymer Pin Insulator
Fixing of LT Three Phase X arm
Fixing of V X arm 3.5 Feet/4.5 Feet/5 Feet
Fixing of HT/LT TI Fitting
Fixing of11 KV Strain Disc with Hardwares
Fixing of two Tapping X arm per cut Point upto 33 KV line including fixing of Disc,Insulators and Jumpering etc
Paving and String of Conductors of above 7/2.59 mm ACSR or other equivalent Conductor upto 7/3.35 mm ACSR OR other equivalent Conducter
Releasing and re-erection (resagging) of one run of all sizes of conductor
Mass Concreting of Poles
Sleeve Concreting
Earthing of Poles with GI Wire 4 or 6 swg by Coil Earthing
Loading and unloading Charges of All REC,RCC Pole above 8.00 m length
Unloading of all types REC,RCC Pole above 8.00 m length
Loading and unloading Charges DT's upto 25 KVA
Loading Charges of Conductors from Stores to Site
Un Loading Charges of Conductors from Stores to Site
Loading and unloading Charges of Line materials
Loading and unloading Charges of strain Disc
Loading and unloading of LT Pin Insulator, Shackle. Guy Shackle, LT Pin, Metal Parts, HT pin etc.,
Transporting of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50KM
For a lead upto 5 KM.
Transporting of Conductors of all Size from road side to pit location upto one KM
Transporting of Distribution Transformer/Line materials from strores to office/site upto 10KM distance by engaging 1 Ton capacity minidoor (Lorry)
Erection of 11KV Single pole structure including erection of DT complete without centre support
Dismantling of RCC, PSC Poles 7.5Mts including the closing of pits per pole
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of cross arm clamps TI fitting hardwares, insulators etc.,
G.S.T. @18% for Labour
E.P.F. @ 13% should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .