| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance CHITAVAR JOGI MEETAI HATHRAS | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 CrAdmitted-Finance | ₹5.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.2 CrAdmitted-Finance | ₹5.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹5.2 CrAdmitted-Finance | ₹5.2 Cr | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH KUMAR SHARMA L1 | KULDEEP KUMAR CONTRACTOR L3 | M/S V P CONSTRUCTION L4 | M/S ALAKNANDA ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Additional two floor at Pareshan Bhawan Gomtinagar Lucknow | |||||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 70 | cum | 212.01 ₹14,840.70 | 216.66 ₹15,166.20 | 217.94 ₹15,255.80 | 214.19 ₹14,993.30 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 75 | CuM | 5,309.54 ₹4.0 L | 5,425.91 ₹4.1 L | 5,457.84 ₹4.1 L | 5,364.12 ₹4.0 L |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 80 | CuM | 7,367.95 ₹5.9 L | 7,529.45 ₹6.0 L | 7,573.75 ₹6.1 L | 7,443.7 ₹6.0 L |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 245 | cum | 8,839.95 ₹21.7 L | 9,033.71 ₹22.1 L | 9,086.86 ₹22.3 L | 8,930.83 ₹21.9 L |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 590 | CuM | 9,371.47 ₹55.3 L | 9,576.88 ₹56.5 L | 9,633.23 ₹56.8 L | 9,467.81 ₹55.9 L |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 2,600 | SQM | 755.26 ₹19.6 L | 771.81 ₹20.1 L | 776.36 ₹20.2 L | 763.02 ₹19.8 L |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for Shelves (Cast in situ) | 40 | SQM | 755.26 ₹30,210.40 | 771.81 ₹30,872.40 | 776.36 ₹31,054.40 | 763.02 ₹30,520.80 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 2,000 | SQM | 599.81 ₹12.0 L | 612.96 ₹12.3 L | 616.57 ₹12.3 L | 605.98 ₹12.1 L |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 2,000 | SQM | 783 ₹15.7 L | 800.16 ₹16.0 L | 804.87 ₹16.1 L | 791.05 ₹15.8 L |
Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
3 Oct 2025, 2:00 pmClosed
SE Civil attach to CE Civil Trans II
SE Civil Hq Upptcl, 9th floor shakti bhawan, Lucknow
Construction of Additional two floor at Pareshan Bhawan Gomtinagar Lucknow
2025_UPCTL_1071273_1
03/SE(Civil)/2025-26
Open Tender
Civil Works
180 days
SE Civil Hq Upptcl, 9th floor shakti bhawan, Luckn
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Ex. Engg(H.Q.) Civil UPPCL
₹10.2 L
7 Feb 2026
6 Sept 2025
4 Oct 2025
6 Sept 2025
3 Oct 2025
6 Sept 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.60 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_1954825.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid