| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹74,661.90Accepted-Finance | ₹74,661.90 | 1 | Accepted-Finance Accept |
| 2 | 2₹81,334.50Accepted-Finance | ₹81,334.50 | 2 | Accepted-Finance Accept |
| 3 | 3₹1.7 LAccepted-Finance | ₹1.7 L | 3 | Accepted-Finance Accept |
| Sl No | Description | Qty | Unit | M/S SHEKHAR ENGINEERING WORKS L3 | rbs engineering L1 | M/S DHIRENDRA SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00WORK | ||||||
| 2.00Centrifuging of complete transformer oil in main tank of the trasformer taking PPM/IR/BDV value of transformer oil at an interval 4 Hrs. (as per UPPTCL Norms) till the desired/required value reached as per direction of supervision engineer. The work also includes opening/re-connecting of HV,LV jumpers, bushing and earthing & cleaning to complete above T/Fs body, radiators fins, HV, LV & Neutral bushing etc. with detergent mixed water and wiping/rubbing with cotton clothess to remove rust, dust, and oil after centrifuging of transformer oil (Centrifuing machine along with operator & BDV machine & magger shall be provided by the contractor at his own cost) Note : Minimum requirement of centrifuging machine is 8 KL/Hrs and 3 stage heaters circuit and latest report of replacement of filters of centrifuging machine will be submitted by contractor. Centrifuging work to be carried out as per following details :- 132 KV Substations | ||||||
| 2.10 | 63MVA T/F-I (Aditya), 132KV Fatehgarh | 18,010 | Ltr. | 3.99 ₹71,859.90 | 1.79 ₹32,237.90 | 1.95 ₹35,119.50 |
| 2.20 | 63MVA T/F-I (Atlanta), 132KV Neebkarori | 23,700 | Ltr. | 3.99 ₹94,563 | 1.79 ₹42,423 | 1.95 ₹46,215 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
8 Dec 2025, 12:00 pmClosed
EE ETD FATEHGARH
132 KV SUBSTATION BEWAR ROAD FATEHGARH, FARRUKHABAD-209602
CENTRIFUGING OF COMPLETE TRANSFORMER OIL IN MAIN TANK OF 63 MVA TANK OF 63 MVA TRANSFORMER OIL IN MAIN TANK OF 63 MVA TRANSFORMER AT 132 KV SUBSTATION NEEBKARORI AND FATEHGARH UNDER ETD-FATEHGARH
2025_UPTCL_1094598_1
T-03/ETD(F)/2025-26
Open Tender
Electrical Works
90 days
NEEBKARORI AND FATEHGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
UPPTCL ETD FATEHGARH
₹2,000
10 Dec 2025
29 Nov 2025
8 Dec 2025
29 Nov 2025
8 Dec 2025
29 Nov 2025
Amount
Centrifuging of complete transformer oil in main tank of the trasformer taking PPM/IR/BDV value of transformer oil at an interval 4 Hrs. (as per UPPTCL Norms) till the desired/required value reached as per direction of supervision engineer. The work also includes opening/re-connecting of HV,LV jumpers, bushing and earthing & cleaning to complete above T/Fs body, radiators fins, HV, LV & Neutral bushing etc. with detergent mixed water and wiping/rubbing with cotton clothess to remove rust, dust, and oil after centrifuging of transformer oil (Centrifuing machine along with operator & BDV machine & magger shall be provided by the contractor at his own cost) Note : Minimum requirement of centrifuging machine is 8 KL/Hrs and 3 stage heaters circuit and latest report of replacement of filters of centrifuging machine will be submitted by contractor. Centrifuging work to be carried out as per following details :- 132 KV Substations
63MVA T/F-I (Aditya), 132KV Fatehgarh
63MVA T/F-I (Atlanta), 132KV Neebkarori
M/S DHIRENDRA SINGH (BID ID -5715677)
M/S SHEKHAR ENGINEERING WORKS (BID ID -5726931)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
T03.pdf
Tender Documents • 0.77 MB
BOQ_2012899.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid