Tender Value
₹7.6 L
EMD Value
₹76,000
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Div- Prayagraj
Executive Engineer Minor Irrigation Div- Prayagraj
Construction of Anicut- Awajipur Rithawa Anicut, Rithawa, Amouli, Fatehpur
2026_UPMID_1148028_2
147/M.I./AC./NIVIDA SUCHNA/2026-27 DATE 02-05-2026
Open Tender
Civil Works
Percentage
60 days
as per Work/Item Description
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer Minor Irrigation Division
₹76,000
Yes
15 Oct 2026
13 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering work by 10 HP Diesel pump set with operator & P.O.L. | 150 | Hrs. | 190 | ₹28,500 |
| 2 | (i lift) Making Diversion drain With o/soil up to 1.50 m. lift & 30m.lead i/all complet. | 180 | cum. | 81 | ₹14,580 |
| 3 | (ii lift) Making Diversion drain With o/soil up to 1.50 m. to 1.80 m. lift & 30m. lead i/all complet. | 18 | cum. | 83.2 | ₹1,497.6 |
| 4 | (i lift) Earth work excavation in ordinary soil / kanker mixed hard soil I/c Up to 1.50 m. lift and 30 m. lead | 73.5 | cum. | 81 | ₹5,953.5 |
| 5 | (ii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.50 m. to 1.80 m lift and 30 m. lead | 37.84 | cum. | 84.75 | ₹3,206.94 |
| 6 | Removal of slush from nala bed before excavation s.soil Up to 2.40 m. to 2.70 m lift and 30 m. lead | 11.02 | cum. | 108.75 | ₹1,198.43 |
| 7 | Earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. Beyond 1.50 lift and 30 m. lead | 64.67 | cum. | 113.75 | ₹7,356.21 |
| 8 | P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work. | 33.58 | cum. | 4,814.55 | ₹1,61,672.59 |
| 9 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation. | 34.97 | cum. | 5,533.31 | ₹1,93,499.85 |
| 10 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure. | 41.42 | cum. | 5,533.31 | ₹2,29,189.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2148447.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .