Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAdmitted-Finance | ₹40.9 L | L1 | Admitted-Finance |
| 2 | L2₹45.6 LAdmitted-Finance NEAR MADHU SMRITEE SANSTHAN LINK ROAD RANGBARI KOTA 324005 | KOTA | KOTA | RAJASTHAN | 324005 | ₹45.6 L | L2 | Admitted-Finance |
| 3 | L3₹45.2 LAdmitted-Finance F 16 BLOCK II AMBE MARKET NEAR RITURAJ VATIKA CHITTORGARH RAJ 312001 | CHITTORGARH | CHITTORGARH | RAJASTHAN | 312001 | ₹45.2 L | L3 | Admitted-Finance |
| 4 | L4₹46.3 LAdmitted-Finance BIKANER ROAD SURATGARH 335804 | GANGANAGAR | RAJASTHAN | 335804 | ₹46.3 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | VEDANSH INFRA SERVICES PRIVATE LIMITED L3 | MIDDHA ENTERPRISES L4 | TECHNOMECH ENGINEERING COMPANY L2 | SP ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|
| 1.00a. Station Lighting | |||||||
| 1.10Operational arrangement of complete illumination system in main plant round O' Clock in three shifts | |||||||
| 1.11 | Skilled Manpower | 6 | Man days | 50 ₹9.0 L | 60 ₹9.2 L | 54 ₹9.0 L | 13 ₹8.2 L |
| 1.12 | Un-skilled Manpower | 6 | Man days | 50 ₹8.4 L | 60 ₹8.6 L | 54 ₹8.4 L | 13 ₹7.5 L |
| 2.00Routine maintenance of electrical works related to station lighting in General Shift | |||||||
| 2.10 | Skilled Manpower | 2 | Man days | 50 ₹3.0 L | 60 ₹3.1 L | 54 ₹3.0 L | 13 ₹2.7 L |
| 2.12 | Un-skilled Manpower | 2 | Man days | 50 ₹2.8 L | 60 ₹2.9 L | 54 ₹2.8 L | 13 ₹2.5 L |
| 3.00Extra work required during annual shut down of Unit#1 to 4 for lighting & supply arrangement in day hours and extra work required to restore normal system in case of failure of illumination in particular area as and when required. | |||||||
| 3.10 | Skilled Manpower | 2 | Man days | 50 ₹40,921 | 60 ₹41,921 | 54 ₹41,321 | 13 ₹37,221 |
| 3.12 | Un-skilled Manpower | 2 | Man days | 50 ₹38,131 | 60 ₹39,131 | 54 ₹38,531 | 13 ₹34,431 |
Tender Value
₹70.2 L
EMD Value
₹1.4 L
Closing Date
4 Feb 2026, 1:00 pmClosed
Chief Engineer CTPP
ADM Building, Shakti Parisar, Motipura Chowki, Chhabra, Distt.-Baran (Raj.) 325220
Annual contract for lighting work of residential township and station lighting, stage-I, phase-I and II CTPP Chhabra
2026_RRVUN_527404_1
679/2025-26/SE(SWGR-Mtc.)/CTPP
Open Tender
Electrical Works
CTPP RVUNL, Chhabra
As per Section -G of Tender Documents
2 documents required · 2 mandatory
₹1,180
Assistant Account Officer, CTPP, RVUN
₹1.4 L
28 Feb 2026
20 Jan 2026
5 Feb 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
a. Station Lighting
Operational arrangement of complete illumination system in main plant round O' Clock in three shifts
Skilled Manpower
Un-skilled Manpower
Routine maintenance of electrical works related to station lighting in General Shift
Skilled Manpower
Un-skilled Manpower
Extra work required during annual shut down of Unit#1 to 4 for lighting & supply arrangement in day hours and extra work required to restore normal system in case of failure of illumination in particular area as and when required.
Skilled Manpower
Un-skilled Manpower
b. Residential Township & 33/11 KV Sub-Station CTPP Plant
Operation and up -keeping of 5 Nos. 11/0.4 KV Compact Substations, 26 Nos. Feeder Section pillars, Ring Main Unit, LT line and underground cables , it's network , recording electrical complaints of residential & non residential buildings and street lighting work in shift duties round O' Clock
Skilled Manpower
Semi-skilled Manpower
Un-skilled Manpower
Extra work equired during VVIP visit and emergencies ,as & when required
Skilled Manpower
Un-skilled Manpower
To attend faults of entire electrical system ,during the General Shift
Skilled Manpower
Un-skilled Manpower
Operation and up keeping of 5 MVA Transformers, 33 KV VCBs, 11 KV VCBs, 33 KV PT & CT, 11 KV PT & CT, 33KV & 11 KV LAs etc. round O' Clock in three shifts at 33/11 KV Sub-Station in Plant premises
Skilled Manpower
Un-skilled Manpower
Providing assistance in energy meter reading, preparation of energy bills and bill distribution etc.
High Skilled Manpower
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE:- Part-B {L1 will be considered on totality of Part -A and Part- B} (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) The lowest bidder will be decided after considering the quoted value in totality, along with the following: CASE-1: wherein, same/equal bids received from two or more bidders i.e. resulting more the one L-1 bidder. in such situations, For the determination of L-1 bidder,all the bidder quoted same lowest rates shall be called for and decision shall be taken through a transparent lottery system in presence of all the bidders. CASE-2: Wherein , NIL service charges/consideration or negative service charges / tender premium are quoted by the bidder in decimals/fractions or in percentage(%) , than it's bid shall be treated as unresponsive and will summarily be rejected. Therefore, bidders are advised to fill the BOQ by quoting service charges/tender premium in Rupees trems only, ignoring any decimals/Fractions.
NUMBER #
Annual contract for lighting work of residential township and station lighting , stage-I, phase-I&II CTPP Chhabra. (As per Part-B of G-Schedule and Scope of work )
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TENDERDOCUMENT.pdf
Tender Documents • 12.15 MB
BOQ_941327.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid