Loading…
Loading…
Tender Value
₹37.0 Cr
EMD Value
₹37.0 L
Closing Date
9 Sept 2026, 2:00 pm
Executive Engineer,RCD Road Division, Jamshedpur
Executive Engineer,RCD Road Division, Jamshedpur
Reconstruction of Manushmudia of Bahragora to Darishol Chowk Road. Total Length 10.274 KM for year 2025-26
2026_CECOM_117296_1
RCD/JAMSHEDPUR/1607/26-27
Open Tender
Civil Works
Item Rate
365 days
Manushmudia of Bahragora
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹37.0 L
CE(COMM),RCD,DHURWA RANCHI
14 Aug 2026
14 Aug 2026
10 Sept 2026
14 Aug 2026
9 Sept 2026
14 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing the road land,(Clearing and grubbing the road land including uprooting rank vegetation,grass,bushes,shrubs,saplings and trees girth upto 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of sercviceable materials to be used or auctioned upto a lead of 1000 mts. including removal and disposal of organic soil not exceeding 150mm in thickness.RCD S.O.R.2.03(i)A | 7.82 | hect | 88,499.5 | ₹6,92,066.09 |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(ii)600-900 mm | 65 | Each | 925.6 | ₹60,164 |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(iii)900-1800mm | 176 | Each | 1,434.8 | ₹2,52,524.8 |
| 4 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(iv)>1800mm | 94 | Each | 2,543.7 | ₹2,39,107.8 |
| 5 | Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately.RCD S.O.R.2.14 | 19 | Each | 185.1 | ₹3,516.9 |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (iii) (I) By manual means. (B) Rubble stone masonry in cement mortar | 1,609.34 | m3 | 286.3 | ₹4,60,754.04 |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (i) (I) By manual means. (B) Cement concrete Grade M-15 & M-20 | 141.18 | m3 | 452.4 | ₹63,869.83 |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (i) (II) By Mechanical means . (B) Prestressed/ Reinforced cement concrete grade M-20 & above | 81 | m3 | 887 | ₹71,847 |
| 9 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. RCD SOR 2.04 (ix) B Above 600mm to 900mm dia | 90 | m | 796 | ₹71,640 |
| 10 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres. RCD SOR 3.15 (i) By Mechanaical Means using Hydraulic excavator | 33,376 | m2 | 4.8 | ₹1,60,204.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_158516.xls
BOQ • 0.38 MB
sbd.pdf
Tender Documents • 1.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].