Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.3 L+₹84,743.98 (7.37%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.7 L+₹1.2 L (10.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-refer to corrigendum . D class cannot apply | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-GST 3B RETURN OF LATEST QTR OR LAST THREE MONTH OR MONTH NOT UPLOADED |
Tender Value
₹18.2 L
EMD Value
₹36,320
Closing Date
21 Jul 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of Walls of Community Hall near Chandi Mata Mandir, Pyt. Jagti, Block Nagrota Under scheme CDF For the Year 2026-27
2026_RDPR_315011_1
e-NIT No. 99 REWJ of 2026-27 dated 07-07-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹36,320
24 Jul 2026
7 Jul 2026
22 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies,
shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of
centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size.
in 1:1.5:3 mix | 5.54 | cum | 9,821.25 | ₹54,409.73 |
| 2 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 554.46 | kg | 123.2 | ₹68,309.47 |
| 3 | Centring and shuttering including strutting, propping etc and removal of the formwork. A) Sides and soffits of Lintel and beams and walls | 26.25 | sqft | 577.55 | ₹15,160.69 |
| 4 | Centring and shuttering including strutting, propping etc and removal of the formwork. B) Suspended Floor, Roofs ,Landing,etc | 25.3 | sqft | 718.2 | ₹18,170.46 |
| 5 | Centring and shuttering including strutting, propping etc and removal of the formwork. C) Edges of slab | 30.94 | rmt | 262 | ₹8,106.28 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar | 167.88 | cum | 7,571.55 | ₹12,71,111.81 |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor
five level | 167.88 | cum | 1,455.65 | ₹2,44,374.52 |
| 8 | Carriage of construction material a) Sand avg. lead 10Km by MT | 46.03 | cum | 279.04 | ₹12,844.21 |
| 9 | Carriage of construction material b) Aggregate avg lead 10Km by MT | 4.71 | cum | 279.04 | ₹1,314.28 |
| 10 | Carriage of construction material c) Bricks avg lead 35Km by MT | 79,746 | nos | 1.53 | ₹1,22,011.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1020436.xls
BOQ • 0.30 MB
Corrigendum99.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .